|||:::. JHARKHAND TENDERS .:::|||

Water Resources Division
[Government of Jharkhand]

Particulars

Last date of sale

Last date of Submission

Construction of WBM road on Service road

---

02.06.12 at 5.00 pm

Strengthening of Bank

---

28.05.12 at 5.00 pm

Strengthening of Bank

---

28.05.12 at 5.00 pm

Strengthening of Bank

---

28.05.12 at 5.00 pm

Strengthening of Bank

---

28.05.12 at 5.00 pm

Construction of Dam

---

30.05.12 at 5.00 pm

Flood protection work

---

25.05.12 at 5.00 pm

Flood protection work

---

25.05.12 at 5.00 pm

Earth work

---

23.05.12 at 5.00 pm

Earth work

---

23.05.12 at 5.00 pm

Earth work

---

23.05.12 at 5.00 pm

Construction of Embankment

---

22.05.12 at 5.00 pm

Construction of Dam

---

22.05.12 at 5.00 pm

Corrigendum 50939 (irrigation)

---

----

Construction of Dam

---

04.05.12 at 5.00 pm

E/W and Lining

---

10.05.12 at 5.00 pm

E/W and Lining

---

10.05.12 at 5.00 pm

Construction of Dam

---

02.05.12 at 5.00 pm

Anti Erosion Work

---

07.05.12 at 5.00 pm

Construction of Dam

---

02.05.12 at 5.00 pm

Construction of Dam

---

04.05.12 at 5.00 pm

Residual Work

---

30.04.12 at 5.00 pm

Construction of Bridge

---

03.05.12 at 5.00 pm

Corrigendum 50489 (irrigation)

---

---

Corrigendum 50490 (irrigation)

---

---

Corrigendum 50488 (irrigation)

---

---

Construction of Dam

---

20.04.12 at 5.00 pm

Construction of Dam

---

10.04.12 at 5.00 pm

Residual Earth Work

---

26.04.12 at 5.00 pm

Residual Earth Work

---

26.04.12 at 5.00 pm

Construction of C.D. Work

---

26.04.12 at 5.00 pm

Residual Earth Work

---

11.04.12 at 5.00 pm

Residual Earth Work

---

07.04.12 at 5.00 pm

Residual Earth Work

---

07.04.12 at 5.00 pm

Construction of Dam

---

04.04.12 at 5.00 pm

Residual Earth Work

---

15.04.12 at 5.00 pm

49739 (Irrigation)11-12 

---

-----

49816 (Irrigation)11-12 

---

-----

Construction of Dam

---

13.03.12 at 5.00 pm

Construction of Dam

---

15.03.12 at 5.00 pm

Construction of One No Double Storage Barrack

---

14.03.12 at 5.00 pm

Construction of Dam

---

15.03.12 at 5.00 pm

Construction of Building

---

13.03.12 at 5.00 pm

Construction of Dam

---

14.03.12 at 5.00 pm

Corrigendum-49010 (Irrigation)/11-12 and PR No. 49470 (Irrigation)11-12 

---

---

Construction of Bridge

---

12.03.12 at 5.00 pm

Residual Earth Work

---

06.03.12 at 5.00 pm

Corrigendum 49010(irrigation)

---

----

Construction of Dam

---

01.03.12 at 5.00 pm

Construction of Dam

---

24.02.12 at 5.00 pm

Construction of Dam

---

25.02.12 at 5.00 pm

Earth Work, Lining

---

28.02.12 at 5.00 pm

Construction Head Regulator

---

24.02.12 at 5.00 pm

Construction of Series Checkdam

---

22.02.12 at 5.00 pm

Construction of Series Checkdam

---

23.02.12 at 5.00 pm

Construction of Series Checkdam

---

23.02.12 at 5.00 pm

Construction of Series Checkdam

---

24.02.12 at 5.00 pm

Cancellation ( Irrigation) 47918

---

---

Corrigendum ( Irrigation) 48972

---

---

Construction of Series Checkdam

---

22.02.12 at 5.00 pm

Construction of Series Checkdam

---

21.02.12 at 5.00 pm

Construction of Series Checkdam

---

21.02.12 at 5.00 pm

Residual earth, Structure and P.C.C Lining work

---

27.02.12 at 5.00 pm

Structure and P.C.C Lining work of water cources

---

27.02.12 at 5.00 pm

Residual Work

---

25.02.12 at 3.00 pm

Construction of Dam

---

10.02.12 at 3.00 pm

Construction of Dam

---

22.02.12 at 3.00 pm

Construction of Dam

---

15.02.12 at 3.00 pm

Corrigendum ( Irrigation) 48503

---

03.02.12 at 3.00 pm

Construction of series of check dam

---

08.02.12 at 3.00 pm

Construction of series of check dam

---

08.02.12 at 3.00 pm

Cancellation Irrigation 48463

---

03.02.12 at 3.00 pm

Residual Earth Work

---

03.02.12 at 3.00 pm

Construction of series of check dam

---

28.01.12 upto 5.00 pm.

Repair of dams

---

25.01.12 upto 5.00 pm.

Construction of series of check dam

---

31.01.12 upto 5.00 pm.

Construction of CR-cum-HR-cum-SLR Bridges

---

30.01.12 upto 5.00 pm.

Construction of series of check dam

---

27.01.12 upto 5.00 pm.

Construction of series of check dam

---

27.01.12 upto 5.00 pm.

Construction of series of check dam

---

27.01.12 upto 5.00 pm.

CONSTRUCTION OF C.D. WORK

---

27.01.12 upto 5.00 pm.

Residual Earth Work

---

30.01.12 upto 5.00 pm.

Repair of Canal

---

21.01.12 upto 5.00 pm.

Construction Head Regulator

---

24.01.12 upto 5.00 pm.

Construction of series of check dam

---

24.01.12 upto 5.00 pm.

Construction of series of check dam

---

24.01.12 upto 5.00 pm.

Construction of series of check dam

---

24.01.12 upto 5.00 pm.

Construction of Concrete Lining work

---

20.01.12 upto 5.00 pm.

Construction of series of check dam

---

19.01.12 upto 5.00 pm.

Construction of series of check dam

---

19.01.12 upto 5.00 pm.

Construction of series of check dam

---

19.01.12 upto 5.00 pm.

Corrigendum (Irrigation) 47923

---

--

CONSTRUCTION OF RESIDUAL E/W

---

21.01.12 upto 5.00 pm.

For lining work of Canal

---

17.01.12 upto 5.00 pm.

Construction of Aqueduct

---

12.01.12 upto 5.00 pm.

Construction of series of check dam

---

13.01.12 upto 5.00 pm.

Construction of series of check dam

---

13.01.12 upto 5.00 pm.

Construction of series of check dam

---

13.01.12 upto 5.00 pm.

Construction of P.C.C. Lining work

---

09.01.12 upto 5.00 pm.

Corrigendum (Irrigation)45527

---

---

Construction of Series Checkdam

---

11.01.12 at 5.00 pm

Construction of Satnala Dam

---

09.01.12 at 5.00 pm

Construction of Series Checkdam

---

02.01.12 at 5.00 pm

Construction of Series Checkdam

---

11.01.12 at 5.00 pm

Construction of Series Checkdam

---

11.01.12 at 5.00 pm

Construction of Series Checkdam

---

11.01.12 at 5.00 pm

Earth Work, Lining and Structure in OR-26 Govindpur Minors and its W/C Ex. Km. 56.63 of C.L.M.C.

---

07.01.12 at 5.00 pm

Corrigendum Irrigation 47527

---

-----

Cancelled WRD 47139

---

-----

Bed clearance of Ajay Main Canal from Ch. 460 to 1700

---

30.12.11 at 3.00 pm

Earth Work and Lining

---

03.01.12 at 3.00 pm

Construction of Residual work of approach channel

---

31.12.11 at 3.00pm.

Construction of T-Beam Elephant Corridor

---

02.01.12 at 3.00 pm

Corrigendum Irrigation 47098

---

---

Construction of Communal Building

26.12.11 to 29.12.11

31.12.11 at 3.00pm.

Construction of series checkdam

19.12.11 

20.12.11 at 5.00pm.

Construction of WBM road on Service road from Km. 16.768 to Km. 32.308 of CLMC.

---

26.12.11 at 5.00pm.

E/W and Lining from 6.39 km to 30.20 km of Icha Right Main Canal

---

24.12.11 at 5.00pm.

Cancellation of Tender (wrd-47169)

---

---

Earth Work and Lining

---

22.12.11 at 5.00pm.

Residual Earth Work and Lining

---

22.12.11 at 5.00pm.

Construction  of Series of Check Dams

---

28.12.11 at 5.00pm.

Construction of Aqueduct

---

20.12.11 at 5.00pm.

Earth Work, Structures and lining work

---

22.12.11 at 5.00pm.

Corrigendum (WRD) 47171

---

17.12.11 at 5.00pm.

Construction of series checkdam

---

28.12.11 at 5.00pm.

Construction of series checkdam

---

28.12.11 at 5.00pm.

Construction of balance work of Sinni Weir over Sona river

---

30.12.11 at 5.00pm.

Construction of Road

05.12.11 to 12.12.11

13.12.11 at 3.00pm.

Construction of Road

08.12.11 to 12.12.11

15.12.11 at 3.00pm.

Construction of series checkdam

----

15.12.11 at 5.00pm.

Earth Work, Structures and P.C.C. lining work

----

17.12.11 at 5.00pm.

Construction of series checkdam

----

15.12.11 at 5.00pm.

Construction of series checkdam

----

15.12.11 at 5.00pm.

Construction of series checkdam

----

15.12.11 at 5.00pm.

Residual Earth Work and Lining between km. 94.20 to 106.46 of Chandil Left Main Canal. 

----

16.12.11 at 5.00pm.

Construction of series checkdam

----

15.12.11 at 5.00pm.

Construction of series checkdam

----

19.12.11 at 5.00pm.

Construction of series checkdam

----

19.12.11 at 5.00pm.

Construction of series checkdam

----

19.12.11 at 5.00pm.

Corrigendum (Irrigation) 46725

----

---

Corrigendum (Irrigation) 46724

----

---

Planning and Design of Sewane Reservoir Scheme

----

18.12.11 at 5.00pm.

Construction of 19 nos. SLR and 5 nos. DLR bridges

----

14.12.11 at 5.00pm.

Supply of Water

----

18.12.11 at 5.00pm.

For lining work

----

16.12.11 at 5.00pm.

Construction of Earth Work Lining

----

16.12.11 at 5.00pm.

Construction of Metel (W.B.M.) Service Road

----

16.12.11 at 5.00pm.

Construction of Concrete Lining work

----

16.12.11 at 5.00pm.

Corrigendum (Irrigation) 46706

----

---

Corrigendum (Irrigation) 46707

----

---

Corrigendum (Irrigation) 46705

----

---

Construction of series checkdam

----

13.12.11 at 5.00pm.

Construction of series checkdam

----

13.12.11 at 5.00pm.

Construction of series checkdam

----

13.12.11 at 5.00pm.

Construction of series checkdam

----

08.12.11 at 5.00pm.

Construction of series checkdam

----

14.12.11 at 5.00pm.

Construction of series checkdam

----

14.12.11 at 5.00pm.

Construction of series checkdam

----

09.12.11 at 5.00pm.

Construction of series checkdam

----

09.12.11 at 5.00pm.

Construction of series checkdam

----

09.12.11 at 5.00pm.

Construction of series checkdam

----

25.11.11 at 5.00pm.

Construction of series checkdam

----

25.11.11 at 5.00pm.

E/W and Lining from 0.00 km to 12.22 km of Kharkai Right Bank Main Canal

----

07.12.11 at 5.00pm.

E/W and Lining from 13.48 km to 17.22 km of Kharkai Right Bank Main Canal

----

07.12.11 at 5.00pm.

E/W and Lining from 17.22 km to 29.83 km of Kharkai Right Bank Main Canal

----

07.12.11 at 5.00pm.

Corrigendum Irrigation 46426

----

---

Corrigendum Irrigation 46420

----

---

Corrigendum Irrigation 46422

----

---

Corrigendum Irrigation

----

---

Construction of series of Check Dam on Baghshila-Koiridih Joriya & Kansjor Joriya Block-Madhupur

----

29.11.11 at 3.00pm.

Construction of Series of Check Dam

----

28.11.11 at 5.00pm.

Construction of series of Check Dam on Aamgachhi Joriya, Khijuriya Joriya and Kurum Tanr Joriya, Sarawn

----

29.11.11 at 5.00pm.

Construction of P.C.C. Lining work between  KM. 60.06 to 63.00 in cutting zone and filling zone of Chandil Left Main Canal.

----

25.11.11 at 5.00pm.

Residual Earth Work and Lining between km. 94.20 to 106.46 of Chandil Left Main Canal.

----

25.11.11 at 5.00pm.

Renovation of Triveni weir head works

----

28.11.11 at 5.00pm.

Construction of H-Escape Regulator

----

28.11.11 at 5.00pm.

Construction of Check Dam

16.11.11 to 21.11.11

22.11.11 at 3.00pm.

CONSTRUCTION OF P.C.C. LINING IN CUTTING ZONE FROM KM. 16.768 TO KM. 32.308 OF C.L.M.C.

-----

26.11.11 at 5.00pm.

Construction of series of check dam across Fudi Nala, Bartoli Nala, Rai Nala, Sosotoli Nala in Khunti block of Khunti District

-----

22.11.11 at 5.00pm.

Construction of series of check dam acros Belahati and Bingurua Nala under Khunti block of Khunti District

-----

21.11.11 at 5.00pm.

Construction of Series of check dam Jiruliya Nala and Bhramri Nala under Block – Jama, District - Dumka

-----

09.12.11 at 5.00pm.

Construction of series of check dam Ero Nala under Block-Kathikund Disrtict- Dumka

-----

07.12.11 at 5.00pm.

Construction of Series of check at Butwaria nala under Block-Raneshwar District- Dumka

-----

07.12.11 at 5.00pm.

Construction of Series of check dam Baskidih Nala & Nijhor Nala, Block – Masaliya, District - Dumka

-----

09.12.11 at 5.00pm.

Construction of check dam Pathithan, Thadhi, Bhurisimal, Bankdih, Podaidih Sighni under block-Dumka , Dristrict- Dumka

-----

09.12.11 at 5.00pm.

Construction of Series of check dam Nawadih & Gobindpur under block- Saraiyahat, District - Dumka

-----

09.12.11 at 5.00pm.

Construction of series of check dam at Dumuhani Nala under Block-Dumka Disrtict- Dumka

-----

08.12.11 at 5.00pm.

Construction of check dam at palajori and Bihajori under Block-Jarmundi

-----

08.12.11 at 5.00pm.

Construction of Fall at Km 5.50 of Bagodar Branch Canal Under Konar irrigation Project

-----

26.11.11 at 5.00pm.

Construction of Aqueduct at Km 39.250 of Bagodar Branch Canal Under Konar irrigation Project

-----

26.11.11 at 5.00pm.

Corrigendum ( Irrigation ) 46208

-----

21.11.11 at 5.00pm.

Strengthening of A.M.C.

-----

17.11.11 at 5.00pm.

Corrigendum ( Irrigation ) 46208

-----

---

Corrigendum ( Irrigation ) 46024

-----

Construction of T – Beam Elephant Corridor

-----------

09.11.11 at 5.00pm.

WRD 45823 (Irrigation)

-----------

-----

eProcurement Cancellation Notice

-----------

-----

Corrigendum ( Irrigation ) 45992

-----------

-----

Corrigendum ( Irrigation ) 45824

-----------

-----

Construction of Check Dam

-----------

05.11.11 at 5.00pm.

Construction of Check Dam

-----------

12.11.11 at 5.00pm.

Residual Earth Work

-----------

11.11.11 at 5.00pm.

Construction of Check Dam

-----------

12.11.11 at 5.00pm.

Earth Work, Structures and P.C.C. lining work

-----------

04.11.11 at 5.00pm.

Construction of Check Dam

04.11.11 to 11.11.11

11.11.11 at 3.00pm.

Construction of Check Dam

04.11.11 to 11.11.11

11.11.11 at 3.00pm.

Construction of Community Building

04.11.11 to 11.11.11

12.11.11 at 3.00pm.

Improvement of riding quality

---

04.11.11 at 5.00pm.

Earth Work, Lining and Structures

---

04.11.11 at 5.00pm.

Residual E/WP.C.C.Lining

---

07.11.11 at 5.00pm.

Corrigendum (Irrigation) 45694

---

-----

For lining work

---

03.11.11 at 5.00pm.

Construction of Check Dam

---------

05.11.11 at 5.00pm.

Corrigendum (irrigation) 45175

---------

---

Construction of Check Dam

---------

28.10.2011 at 05.00 pm.

Construction of Check Dam

---------

28.10.2011 at 05.00 pm.

Construction of Check Dam

---------

28.10.2011 at 05.00 pm.

Construction of Concrete Lining Work

---------

18.10.2011 at 05.00 pm.

Construction of Road

---------

18.10.2011 at 05.00 pm.

Construction of Check Dam

12.10.11 to 18.10.11

19.10.2011 at 03.30 pm.

Construction of Aqueduct

---------

14.10.2011 at 05.00 pm.

Construction of Earth Work Lining

---------

14.10.2011 at 05.00 pm.

Construction of check dam

---------

11.10.2011 at 05.00 pm.

Construction of check dam

17.09.2011 to 23.09.2011

24.09.2011 at 05.00 pm.

Earth Work, Lining and Structures in OR-26 Govindpur

------

27.09.2011 at 05.00 pm.

CONSTRUCTION OF P.C.C. LINING

------

30.09.2011 at 05.00 pm.

Construction of T-Beam Elephant corridor 

------

30.09.2011 at 05.00 pm.

CONSTRUCTION OF P.C.C. LINING

------

30.09.2011 at 05.00 pm.

 Construction of Twin Box Duct Elephant Corridor

------

24.09.2011 at 03.00 pm.

Construction of T – Beam Elephant Corridor

------

24.09.2011 at 03.00 pm.

Construction of Chek Dam

------

26.09.2011 at 03.00 pm.

Construction of Chek Dam

------

24.09.2011 at 03.00 pm.

Construction of Chek Dam

------

26.09.2011 at 03.00 pm.

Construction of Chek Dam

------

24.09.2011 at 03.00 pm.

Construction of Residual earth work

------

22.09.2011 at 03.00 pm.

construction of common facilities centre

16.09.2011 to 22.09.2011

23.09.2011 at 03.00 pm.

Construction of Road

05.09.2011 to 07.09.2011

08.09.2011 at 03.00 pm.

Construction of Building

12.09.2011 to 16.09.2011

17.09.2011 at 03.00 pm.

Construction of Water Supply Scheme

05.09.2011 to 08.09.2011

10.09.2011 at 03.00 pm.

Envisaging Construction of Barrages

-----------

18.08.2011 at 05.00 pm.

Construction of Chek Dam

-----------

24.08.2011 at 05.00 pm.

Construction of Chek Dam

-----------

24.08.2011 at 05.00 pm.

Construction of Chek Dam

-----------

23.08.2011 at 05.00 pm.

Construction of Road

08.08.2011 to 10.08.2011

11.08.2011 at 05.00 pm.

Contraction of Pond

06.08.2011 to 09.08.2011

10.08.2011 at 05.00 pm.

Construction of Road

06.08.2011 to 12.08.2011

13.08.2011 at 05.00 pm.

Construction of Chek Dam

---------

20.08.2011 at 05.00 pm.

Construction of Chek Dam

---------

20.08.2011 at 05.00 pm.

Construction of Chek Dam

---------

17.08.2011 at 05.00 pm.

Construction of Chek Dam

---------

17.08.2011 at 05.00 pm.

Construction of Chek Dam

---------

17.08.2011 at 05.00 pm.

Construction of Chek Dam

---------

11.08.2011 at 05.00 pm.

Construction of Chek Dam

---------

11.08.2011 at 05.00 pm.

Construction of Elephant Corridor

---------

30.07.2011 at 03.30 pm.

Construction of Residual Work

---------

30.07.2011 at 03.30 pm.

Construction of Common facility centre

06.07.2011 to 11.07.2011

12.07.2011 at 03.30 pm.

Construction of Dam

-----

07.07.2011 at 03.30 pm.

Construction of Dam

-----

07.07.2011 at 03.30 pm.

Construction of Dam

07.06.2011 to 13.06.2011

14.06.2011 at 03.30 pm.

Construction of Residual earth

----------

14.06.2011 at 03.30 pm.

Construction of Road

31.05.2011 to 06.06.2011

07.06.2011 at 03.30 pm.

Construction of check dam

06.06.2011

07.06.2011 at 03.00 pm.

Construction of Elephant Corridor

--------------

31.05.2011 at 03.00 pm.

Irrigation work

28.04.2011 to 02.05.2011

03.05.2011 at 03.00 pm.

Construction of Check Dam

15.04.2011 to 18.04.2011

19.04.2011 at 03.00 pm.

Construction of pond

18.04.2011 to 20.04.2011

21.04.2011 at 03.00 pm.

Construction of Check Dam

18.04.2011 to 26.04.2011

27.04.2011 at 03.00 pm.

Irrigation work

07.04.2011 to 09.04.2011

11.04.2011 at 03.00 pm.

Construction of pond

15.04.2011 to 20.04.2011

21.04.2011 at 03.00 pm.

Construction of Check Dam

08.04.2011 to 09.04.2011

11.04.2011 at 03.00 pm.

Construction of Check Dam

01.04.2011 to 10.04.2011

11.04.2011 at 03.00 pm.

Construction of Hostel Building

02.04.2011 to 08.04.2011

09.04.2011 at 03.00 pm.

Irrigation work

02.04.2011 to 08.04.2011

09.04.2011 at 03.00 pm.

Irrigation work

26.03.2011 to 29.03.2011

30.03.2011 at 03.00 pm.

Reinstallation of irrigation schemes

18.03.2011 to 23.03.2011

24.03.2011 at 03.00 pm.

Reinstallation of irrigation schemes

21.03.2011 to 23.03.2011

24.03.2011 at 03.00 pm.

Irrigation work

22.03.2011 to 24.03.2011

26.03.2011 at 03.00 pm.

Irrigation work

18.03.2011 to 23.03.2011

24.03.2011 at 03.00 pm.

Repair work

29.03.2011 to 04.04.2011

05.04.2011 at 03.00 pm.

Construction of Check Dam

30.03.2011 to 04.04.2011

05.04.2011 at 03.00 pm.

Construction of Check Dam

21.03.2011 to 24.03.2011

25.03.2011 at 03.00 pm.

Construction of Check Dam

21.03.2011 to 23.03.2011

24.03.2011 at 03.00 pm.

Construction of Check Dam

21.03.2011 to 23.03.2011

24.03.2011 at 03.00 pm.

Construction of Check Dam

17.03.2011 to 22.03.2011

23.03.2011 at 03.00 pm.

Construction of Check Dam

05.03.2011 to 08.03.2011

09.03.2011 at 03.00 pm.

Repair work

03.03.2011 to 07.03.2011

08.03.2011 at 03.00 pm.

Repair work

05.03.2011 to 08.03.2011

09.03.2011 at 03.00 pm.

Reinstallation Work

01.03.2011 to 04.03.2011

05.03.2011 at 03.00 pm.

Repair of Pond

01.03.2011 to 04.03.2011

05.03.2011 at 03.00 pm.

Construction of Check Dam

07.03.2011 to 09.03.2011

10.03.2011 at 03.00 pm.

Construction of Check Dam

28.02.2011 to 03.03.2011

04.03.2011 at 03.00 pm.

Construction of Check Dam

------------

---------------

Construction of Check Dam

01.03.2011 to 07.03.2011

08.03.2011 at 03.00 pm.

Construction of Check Dam

25.02.2011 to 04.03.2011

05.03.2011 at 03.00 pm.

Construction of Check Dam

01.03.2011 to 08.03.2011

09.03.2011 at 03.00 pm.

Construction of redidual

01.03.2011 to 07.03.2011

08.03.2011 at 03.00 pm.

Construction of Check Dam

08.03.2011 to 14.03.2011

15.03.2011 at 03.00 pm.

Construction of Check Dam

23.02.2011 to 28.02.2011

01.03.2011 at 03.00 pm.

Construction of canal

03.03.2011 to 10.03.2011

11.03.2011 at 03.00 pm.

Implementing of e-Tendering System

----------

------------

Construction of Check Dam

23.02.2011 to 28.02.2011

01.02.2011 at 03.00 pm.

Construction of Check Dam

19.02.2011 to 24.02.2011

25.02.2011 at 03.00 pm.

Construction of Check Dam

19.02.2011 to 24.02.2011

25.02.2011 at 03.00 pm.

Construction of Check Dam

23.02.2011 to 28.02.2011

01.03.2011 at 03.00 pm.

Construction of Check Dam

01.03.2011 to 07.03.2011

08.03.2011 at 03.00 pm.

Construction of Check Dam

05.03.2011 to 10.03.2011

11.03.2011 at 03.00 pm.

Construction of Check Dam

23.02.2011 to 28.02.2011

01.03.2011 at 03.00 pm.

Construction of Check Dam

21.02.2011 to 25.02.2011

26.02.2011 at 03.00 pm.

Construction of Check Dam

17.02.2011 to 22.02.2011

23.02.2011 at 03.00 pm.

Construction of Check Dam

19.02.2011 to 24.02.2011

25.02.2011 at 03.00 pm.

Construction of Hostel Building

12.02.2011 to 18.02.2011

19.02.2011 at 03.00 pm.

Reinstallation of irrigation schemes

15.02.2011 to 22.02.2011

23.02.2011 at 03.00 pm.

Construction of Dam

03.02.2011 to 10.02.2011

11.02.2011 at 03.00 pm.

Repair of Pond

27.01.2011 to 31.01.2011

01.02.2011 at 03.00 pm.

Construction of Dam

27.01.2011 to 01.02.2011

02.02.2011 at 03.00 pm.

construction of Well

19.01.2011 to 21.01.2011

22.01.2011 at 03.00 pm.

Reconstruction of Dam 

21.01.2011 to 24.01.2011

25.01.2011 at 03.00 pm.

Reconstruction of irrigation scheme 

29.01.2011 to 04.02.2011

05.02.2011 at 03.00 pm.

Reconstruction of irrigation scheme 

24.01.2011 to 28.01.2011

29.01.2011 at 03.00 pm.

Construction of Checkdam 

17.01.2011 to 20.01.2011

21.01.2011 at 03.00 pm.

Repair of Dam 

21.01.2011 to 27.01.2011

28.01.2011 at 03.00 pm.

Construction of Earthen Dam 

21.01.2011 to 27.01.2011

28.01.2011 at 03.00 pm.

Construction of Storage Room 

24.01.2011 to 28.01.2011

29.01.2011 at 03.00 pm.

Construction of Series of Checkdam 

21.01.2011 to 28.01.2011

29.01.2011 at 03.00 pm.

Construction of Agriculture Information Centre

24.01.2011 to 27.01.2011

28.01.2011 at 03.00 pm.

Irrigation Work

10.01.2011 to 14.01.2011

15.01.2011 at 03.00 pm.

Construction of Series of Checkdam 

10.01.2011 to 14.01.2011

15.01.2011 at 03.00 pm.

Construction of WBM metal Service Road

20.01.2011 to 31.01.2011

01.02.2011 at 03.00 pm.

Construction of Service Road

11.01.2011 to 17.01.2011

18.01.2011 at 03.00 pm.

Contraction of Dam

15.01.2011 to 19.01.2011

20.01.2011 at 03.00 pm.

Construction of Series of Checkdam 

15.01.2011 to 21.01.2011

22.01.2011 at 03.00 pm.

Const. of Residual E/W 

10.01.2011 to 17.01.2011

18.01.2011 at 03.00 pm.

Construction of Series of Checkdam 

03.01.2011 to 10.01.2011

11.01.2011 at 03.00 pm.

Construction of Road 

10.01.2011 to 17.01.2011

18.01.2011 at 03.00 pm.

Construction of Agriculture Information Center 

10.01.2011 to 12.01.2011

13.01.2011 at 03.00 pm.

Construction of Series of Checkdam 

12.01.2011 to 17.01.2011

18.01.2011 at 03.00 pm.

Construction of Series of Checkdam 

01.01.2011 to 07.01.2011

8.01.2011 at 03.00 pm.

Construction of Series of Checkdam 

12.01.2011 to 17.01.2011

18.01.2011 at 03.00 pm.

Construction of Series of Checkdam 

11.01.2011 to 15.01.2011

17.01.2011 at 03.00 pm.

Construction of Series of Checkdam 

28.12.2010 to 03.01.2011

04.01.2011 at 03.00 pm.

Construction of Check Dam 

29.12.2010 to 03.01.2011

04.01.2011 at 03.00 pm.

Construction of Check Dam at Kanchi Nala

29.12.2010 to 03.01.2011

04.01.2011 at 03.00 pm.

Lining work at Chandil  Dam

28.12.2010 to 03.01.2011

04.01.2011 at 03.00 pm.

Construction of Check Dam

31.12.2010 to 06.01.2011

07.01.2011 at 03.00 pm.

Construction of Check Dam

28.12.2010 to 03.01.2011

04.01.2011 at 03.00 pm.

Construction of Check Dam

27.12.2010 to 03.01.2011

04.01.2011 at 03.00 pm.

Construction of Check Dam

03.01.2011 to 06.01.2011

07.01.2011 at 03.00 pm.

Construction of Check Dam

27.12.2010 to 03.01.2010

04.01.2011 at 03.00 pm.

Construction of Check Dam

14.12.2010 to 20.12.2010

21.12.2010 at 03.00 pm.

Construction of Check Dam

22.12.2010 to 29.12.2010

30.12.2010 at 03.00 pm.

Lining & Reinstallation work of Dam

27.12.2010 to 04.01.2011

05.01.2011 at 03.00 pm.

Implementation of e-Procurement System

------

23.12.2010 at 11.00 am.

Construction of Bridge

23.12.2010 to 27.12.2010

28.12.2010 at 3.00 pm.

Construction of Tajna Reservoir Scheme

20.12.2010 to 27.12.2010

29.12.2010 at 3.00 pm.

Irrigation work

30.11.2010 to 06.12.2010


07.12.2010 at 3.00 pm.

 Survey of  MAYURAKSHI irrigation project

---


29.11.2010 at 3.00 pm.

Construction of Residual Earth Work

16.11.2010 to 22.11.2010


23.11.2010 at 3.00 pm.

Construction of Check Dam


18.11.2010 to 24.11.2010


25.11.2010 at 3.00 pm.

Construction  of Residual work of approach  Channel (112 M) Intake Structure


18.11.2010 to 24.11.2010


25.11.2010 at 3.00 pm.

Construction of One Way Bridge

18.10.2010 to 25.10.2010

6.10.2010 at 3.00 pm.

Construction of Chek Dam

25.09.2010 to 05.10.2010

06.10.2010 at 3.00 pm.

Repairment work

29.09.2010 to 05.10.2010

06.10.2010 at 3.00 pm.

Construction of Earthen Dam

23.09.2010 to 30.09.2010

01.10.2010 at 3.00 pm.

Anti erosion work

16.09.2010 to 27.09.2010

28.09.2010 at 3.00 pm.

repair / replacement, erection, testing and commissioning of under water and Surface gates.

17.08.2010 to 23.08.2010

25.08.2010 at 3.00 pm.

Construction of Dam

29.07.2010 to 04.08.2010

05.08.2010 at 3.00 pm.

Remaining Water Work

09.07.2010 to 15.07.2010

16.07.2010 at 3.00 pm.

Irrigation work

26.07.2010 to 05.08.2010

06.08.2010 at 3.00 pm.

Construction of Series of Check Dam

25.06.2010 to 30.06.2010

01.07.2010 at 3.00 pm.

 Residual Earth Work

12.06.2010 to 28.06.2010

29.06.2010 at 3.00 pm.

Construction of Flush spillway, spill channel

10.06.2010 to 14.06.2010

15.06.2010 at 3.00 pm.

Concrete lining work

16.06.2010 to 23.06.2010

24.06.2010 at 3.00 pm.

P.C.C. Lining in cutting zone between Km. 32.444 to Km. 35.154 of SLMC.

19.06.2010 to 23.06.2010

24.06.2010 at 3.00 pm.

Construction of Series of Check Dam

11.06.2010 to 17.06.2010

18.06.2010 at 3.00 pm.

Construction of Series of Check Dam

12.05.2010 to 17.05.2010

15.05.2010 at 3.00 pm.

Irrigation work

04.05.2010 to 11.05.2010

12.05.2010 at 3.00 pm.

Irrigation work

17.05.2010 to 20.05.2010

21.05.2010 at 3.00 pm.

Construction of Series of Check

20.04.2010 to 26.04.2010

27.04.2010 at 3.00 pm.

Irrigation work

20.04.2010 to 27.04.2010

28.04.2010 at 3.00 pm.

Extension of Barrel of C.D. work

22.04.2010 to 28.04.2010

29.04.2010 at 3.00 pm.

Construction  of Dam 

17.04.2010 to 21.04.2010

22.04.2010 at 3.00 pm.

Construction  of Parallel Channel 

13.04.2010 to 19.04.2010

20.04.2010 at 3.00 pm.

Expansion of Interest

29.04.2010 to 05.05.2010

06.05.2010 at 3.00 pm.

Construction of Dam

10.04.2010 to 15.04.2010

16.04.2010 at 3.00 pm.

Construction of Check Dam

05.04.2010 to 13.04.2010

15.04.2010 at 3.00 pm.

Construction of  Dam

03.04.2010 to 08.04.2010 at 3.00 pm.

09.04.2010 at 3.00 pm.

Go Top

::  Ranchi Express  ::

:: Jharkhand Classifieds ::

:: Jhakhand Edu. ::

:: Jharkhand Jobs ::