|
Particulars |
Last
date of sale |
Last
date of Submission |
|
Construction of WBM
road on Service road |
--- |
02.06.12 at 5.00 pm |
|
Strengthening of Bank |
--- |
28.05.12 at 5.00 pm |
|
Strengthening of Bank |
--- |
28.05.12 at 5.00 pm |
|
Strengthening of Bank |
--- |
28.05.12 at 5.00 pm |
|
Strengthening of Bank |
--- |
28.05.12 at 5.00 pm |
|
Construction of Dam |
--- |
30.05.12 at 5.00 pm |
|
Flood protection
work |
--- |
25.05.12 at 5.00 pm |
|
Flood protection
work |
--- |
25.05.12 at 5.00 pm |
|
Earth work |
--- |
23.05.12 at 5.00 pm |
|
Earth work |
--- |
23.05.12 at 5.00 pm |
|
Earth work |
--- |
23.05.12 at 5.00 pm |
|
Construction of Embankment |
--- |
22.05.12 at 5.00 pm |
|
Construction of Dam |
--- |
22.05.12 at 5.00 pm |
|
Corrigendum 50939
(irrigation) |
--- |
---- |
|
Construction of Dam |
--- |
04.05.12 at 5.00 pm |
|
E/W and Lining |
--- |
10.05.12 at 5.00 pm |
|
E/W and Lining |
--- |
10.05.12 at 5.00 pm |
|
Construction of Dam |
--- |
02.05.12 at 5.00 pm |
|
Anti Erosion Work |
--- |
07.05.12 at 5.00 pm |
|
Construction of Dam |
--- |
02.05.12
at 5.00 pm |
|
Construction of Dam |
--- |
04.05.12
at 5.00 pm |
|
Residual
Work |
--- |
30.04.12
at 5.00 pm |
|
Construction of
Bridge |
--- |
03.05.12
at 5.00 pm |
|
Corrigendum 50489
(irrigation) |
--- |
--- |
|
Corrigendum 50490
(irrigation) |
--- |
--- |
|
Corrigendum 50488
(irrigation) |
--- |
--- |
|
Construction of Dam |
--- |
20.04.12
at 5.00 pm |
|
Construction of Dam |
--- |
10.04.12 at 5.00 pm |
|
Residual Earth
Work |
--- |
26.04.12 at 5.00 pm |
|
Residual Earth
Work |
--- |
26.04.12 at 5.00 pm |
|
Construction of
C.D. Work |
--- |
26.04.12 at 5.00 pm |
|
Residual Earth
Work |
--- |
11.04.12 at 5.00 pm |
|
Residual Earth
Work |
--- |
07.04.12
at 5.00 pm |
|
Residual Earth
Work |
--- |
07.04.12
at 5.00 pm |
|
Construction of Dam |
--- |
04.04.12 at 5.00 pm |
|
Residual Earth
Work |
--- |
15.04.12 at 5.00 pm |
|
49739
(Irrigation)11-12 |
--- |
----- |
|
49816
(Irrigation)11-12 |
--- |
----- |
|
Construction of Dam |
--- |
13.03.12 at 5.00 pm |
|
Construction of Dam |
--- |
15.03.12 at 5.00 pm |
|
Construction of One
No Double Storage Barrack |
--- |
14.03.12 at 5.00 pm |
|
Construction of Dam |
--- |
15.03.12 at 5.00 pm |
|
Construction of
Building |
--- |
13.03.12 at 5.00 pm |
|
Construction of Dam |
--- |
14.03.12 at 5.00 pm |
|
Corrigendum-49010
(Irrigation)/11-12 and PR No. 49470 (Irrigation)11-12 |
--- |
--- |
|
Construction of
Bridge |
--- |
12.03.12 at 5.00 pm |
|
Residual Earth
Work |
--- |
06.03.12
at 5.00 pm |
|
Corrigendum
49010(irrigation) |
--- |
---- |
|
Construction of Dam |
--- |
01.03.12
at 5.00 pm |
|
Construction of Dam |
--- |
24.02.12
at 5.00 pm |
|
Construction of Dam |
--- |
25.02.12
at 5.00 pm |
|
Earth Work,
Lining |
--- |
28.02.12
at 5.00 pm |
|
Construction Head
Regulator |
--- |
24.02.12
at 5.00 pm |
|
Construction of
Series Checkdam |
--- |
22.02.12
at 5.00 pm |
|
Construction of
Series Checkdam |
--- |
23.02.12
at 5.00 pm |
|
Construction of
Series Checkdam |
--- |
23.02.12
at 5.00 pm |
|
Construction of
Series Checkdam |
--- |
24.02.12
at 5.00 pm |
|
Cancellation (
Irrigation) 47918 |
--- |
--- |
|
Corrigendum (
Irrigation) 48972 |
--- |
--- |
|
Construction of
Series Checkdam |
--- |
22.02.12
at 5.00 pm |
|
Construction of
Series Checkdam |
--- |
21.02.12
at 5.00 pm |
|
Construction of
Series Checkdam |
--- |
21.02.12
at 5.00 pm |
|
Residual earth,
Structure and P.C.C Lining work |
--- |
27.02.12
at 5.00 pm |
|
Structure and
P.C.C Lining work of water cources |
--- |
27.02.12
at 5.00 pm |
|
Residual
Work |
--- |
25.02.12 at 3.00 pm |
|
Construction of Dam |
--- |
10.02.12 at 3.00 pm |
|
Construction of Dam |
--- |
22.02.12 at 3.00 pm |
|
Construction of Dam |
--- |
15.02.12 at 3.00 pm |
|
Corrigendum (
Irrigation) 48503 |
--- |
03.02.12 at 3.00 pm |
|
Construction of
series of check dam |
--- |
08.02.12 at 3.00 pm |
|
Construction of
series of check dam |
--- |
08.02.12 at 3.00 pm |
|
Cancellation
Irrigation 48463 |
--- |
03.02.12 at 3.00 pm |
|
Residual Earth
Work |
--- |
03.02.12 at 3.00 pm |
|
Construction of
series of check dam |
--- |
28.01.12 upto 5.00 pm. |
|
Repair of dams |
--- |
25.01.12 upto 5.00 pm. |
|
Construction of
series of check dam |
--- |
31.01.12 upto 5.00 pm. |
|
Construction of
CR-cum-HR-cum-SLR Bridges |
--- |
30.01.12 upto 5.00 pm. |
|
Construction of
series of check dam |
--- |
27.01.12 upto 5.00 pm. |
|
Construction of
series of check dam |
--- |
27.01.12 upto 5.00 pm. |
|
Construction of
series of check dam |
--- |
27.01.12 upto 5.00 pm. |
|
CONSTRUCTION OF
C.D. WORK |
--- |
27.01.12 upto 5.00 pm. |
|
Residual Earth
Work |
--- |
30.01.12 upto 5.00 pm. |
|
Repair of Canal |
--- |
21.01.12 upto 5.00 pm. |
|
Construction Head
Regulator |
--- |
24.01.12 upto 5.00 pm. |
|
Construction of
series of check dam |
--- |
24.01.12 upto 5.00 pm. |
|
Construction of
series of check dam |
--- |
24.01.12 upto 5.00 pm. |
|
Construction of
series of check dam |
--- |
24.01.12 upto 5.00 pm. |
|
Construction of Concrete Lining work |
--- |
20.01.12 upto 5.00 pm. |
|
Construction of
series of check dam |
--- |
19.01.12 upto 5.00 pm. |
|
Construction of
series of check dam |
--- |
19.01.12 upto 5.00 pm. |
|
Construction of
series of check dam |
--- |
19.01.12 upto 5.00 pm. |
|
Corrigendum
(Irrigation) 47923 |
--- |
-- |
|
CONSTRUCTION OF
RESIDUAL E/W |
--- |
21.01.12 upto 5.00 pm. |
|
For lining
work of Canal |
--- |
17.01.12 upto 5.00 pm. |
|
Construction of
Aqueduct |
--- |
12.01.12 upto 5.00 pm. |
|
Construction of
series of check dam |
--- |
13.01.12 upto 5.00 pm. |
|
Construction of
series of check dam |
--- |
13.01.12 upto 5.00 pm. |
|
Construction of
series of check dam |
--- |
13.01.12 upto 5.00 pm. |
|
Construction of
P.C.C. Lining work |
--- |
09.01.12 upto 5.00 pm. |
|
Corrigendum
(Irrigation)45527 |
--- |
--- |
|
Construction of
Series Checkdam |
--- |
11.01.12 at 5.00 pm |
|
Construction of
Satnala Dam |
--- |
09.01.12 at 5.00 pm |
|
Construction of
Series Checkdam |
--- |
02.01.12 at 5.00 pm |
|
Construction of
Series Checkdam |
--- |
11.01.12 at 5.00 pm |
|
Construction of
Series Checkdam |
--- |
11.01.12 at 5.00 pm |
|
Construction of
Series Checkdam |
--- |
11.01.12 at 5.00 pm |
|
Earth Work,
Lining and Structure in OR-26 Govindpur Minors and its W/C Ex. Km. 56.63
of C.L.M.C. |
--- |
07.01.12 at 5.00 pm |
|
Corrigendum
Irrigation 47527 |
--- |
----- |
|
Cancelled WRD
47139 |
--- |
----- |
|
Bed clearance of
Ajay Main Canal from Ch. 460 to 1700 |
--- |
30.12.11 at 3.00 pm |
|
Earth Work and
Lining |
--- |
03.01.12 at 3.00 pm |
|
Construction of
Residual work of approach channel |
--- |
31.12.11 at 3.00pm. |
|
Construction of
T-Beam Elephant Corridor |
--- |
02.01.12 at 3.00 pm |
|
Corrigendum
Irrigation 47098 |
--- |
--- |
|
Construction of
Communal Building |
26.12.11 to 29.12.11 |
31.12.11 at 3.00pm. |
|
Construction of
series checkdam |
19.12.11 |
20.12.11 at 5.00pm. |
|
Construction of
WBM road on Service road from Km. 16.768 to Km. 32.308 of CLMC. |
--- |
26.12.11 at 5.00pm. |
|
E/W and Lining
from 6.39 km to 30.20 km of Icha Right Main Canal |
--- |
24.12.11 at 5.00pm. |
|
Cancellation of
Tender (wrd-47169) |
--- |
--- |
|
Earth Work and
Lining |
--- |
22.12.11 at 5.00pm. |
|
Residual Earth
Work and Lining |
--- |
22.12.11 at 5.00pm. |
|
Construction of
Series of Check Dams |
--- |
28.12.11 at 5.00pm. |
|
Construction of
Aqueduct |
--- |
20.12.11 at 5.00pm. |
|
Earth Work,
Structures and lining work |
--- |
22.12.11 at 5.00pm. |
|
Corrigendum (WRD)
47171 |
--- |
17.12.11 at 5.00pm. |
|
Construction of
series checkdam |
--- |
28.12.11 at 5.00pm. |
|
Construction of
series checkdam |
--- |
28.12.11 at 5.00pm. |
|
Construction of
balance work of Sinni Weir over Sona river |
--- |
30.12.11 at 5.00pm. |
|
Construction of
Road |
05.12.11 to 12.12.11 |
13.12.11 at 3.00pm. |
|
Construction of
Road |
08.12.11 to 12.12.11 |
15.12.11 at 3.00pm. |
|
Construction of
series checkdam |
---- |
15.12.11 at 5.00pm. |
|
Earth Work,
Structures and P.C.C. lining work |
---- |
17.12.11 at 5.00pm. |
|
Construction of
series checkdam |
---- |
15.12.11 at 5.00pm. |
|
Construction of
series checkdam |
---- |
15.12.11 at 5.00pm. |
|
Construction of
series checkdam |
---- |
15.12.11 at 5.00pm. |
|
Residual Earth
Work and Lining between km. 94.20 to 106.46 of Chandil Left Main Canal. |
---- |
16.12.11 at 5.00pm. |
|
Construction of
series checkdam |
---- |
15.12.11 at 5.00pm. |
|
Construction of
series checkdam |
---- |
19.12.11 at 5.00pm. |
|
Construction of
series checkdam |
---- |
19.12.11 at 5.00pm. |
|
Construction of
series checkdam |
---- |
19.12.11 at 5.00pm. |
|
Corrigendum
(Irrigation) 46725 |
---- |
--- |
|
Corrigendum
(Irrigation) 46724 |
---- |
--- |
|
Planning and
Design of Sewane Reservoir Scheme |
---- |
18.12.11 at 5.00pm. |
|
Construction of
19 nos. SLR and 5 nos. DLR bridges |
---- |
14.12.11 at 5.00pm. |
|
Supply of Water |
---- |
18.12.11 at 5.00pm. |
|
For lining work |
---- |
16.12.11 at 5.00pm. |
|
Construction of
Earth Work Lining |
---- |
16.12.11 at 5.00pm. |
|
Construction of
Metel (W.B.M.) Service Road |
---- |
16.12.11 at 5.00pm. |
|
Construction of
Concrete Lining work |
---- |
16.12.11 at 5.00pm. |
|
Corrigendum
(Irrigation) 46706 |
---- |
--- |
|
Corrigendum
(Irrigation) 46707 |
---- |
--- |
|
Corrigendum
(Irrigation) 46705 |
---- |
--- |
|
Construction of
series checkdam |
---- |
13.12.11 at 5.00pm. |
|
Construction of
series checkdam |
---- |
13.12.11 at 5.00pm. |
|
Construction of
series checkdam |
---- |
13.12.11 at 5.00pm. |
|
Construction of
series checkdam |
---- |
08.12.11 at 5.00pm. |
|
Construction of
series checkdam |
---- |
14.12.11 at 5.00pm. |
|
Construction of
series checkdam |
---- |
14.12.11 at 5.00pm. |
|
Construction of
series checkdam |
---- |
09.12.11 at 5.00pm. |
|
Construction of
series checkdam |
---- |
09.12.11 at 5.00pm. |
|
Construction of
series checkdam |
---- |
09.12.11 at 5.00pm. |
|
Construction of
series checkdam |
---- |
25.11.11
at 5.00pm. |
|
Construction of
series checkdam |
---- |
25.11.11
at 5.00pm. |
|
E/W and Lining
from 0.00 km to 12.22 km of Kharkai Right Bank Main Canal |
---- |
07.12.11 at 5.00pm. |
|
E/W and Lining
from 13.48 km to 17.22 km of Kharkai Right Bank Main Canal |
---- |
07.12.11 at 5.00pm. |
|
E/W and Lining
from 17.22 km to 29.83 km of Kharkai Right Bank Main Canal |
---- |
07.12.11 at 5.00pm. |
|
Corrigendum
Irrigation 46426 |
---- |
--- |
|
Corrigendum
Irrigation 46420 |
---- |
--- |
|
Corrigendum
Irrigation 46422 |
---- |
--- |
|
Corrigendum
Irrigation |
---- |
--- |
|
Construction of
series of Check Dam on Baghshila-Koiridih Joriya & Kansjor Joriya Block-Madhupur |
---- |
29.11.11 at 3.00pm. |
|
Construction of
Series of Check Dam |
---- |
28.11.11 at 5.00pm. |
|
Construction of
series of Check Dam on Aamgachhi Joriya, Khijuriya Joriya and Kurum Tanr
Joriya, Sarawn |
---- |
29.11.11 at 5.00pm. |
|
Construction of
P.C.C. Lining work between KM. 60.06 to 63.00 in cutting zone and
filling zone of Chandil Left Main Canal. |
---- |
25.11.11 at 5.00pm. |
|
Residual Earth
Work and Lining between km. 94.20 to 106.46 of Chandil Left Main Canal. |
---- |
25.11.11 at 5.00pm. |
|
Renovation of
Triveni weir head works |
---- |
28.11.11 at 5.00pm. |
|
Construction of
H-Escape Regulator |
---- |
28.11.11 at 5.00pm. |
|
Construction of
Check Dam |
16.11.11 to 21.11.11 |
22.11.11 at 3.00pm. |
|
CONSTRUCTION OF
P.C.C. LINING IN CUTTING ZONE FROM KM. 16.768 TO KM. 32.308 OF C.L.M.C. |
----- |
26.11.11 at 5.00pm. |
|
Construction of
series of check dam across Fudi Nala, Bartoli Nala, Rai Nala, Sosotoli
Nala in Khunti block of Khunti District |
----- |
22.11.11 at 5.00pm. |
|
Construction of
series of check dam acros Belahati and Bingurua Nala under Khunti block
of Khunti District |
----- |
21.11.11 at 5.00pm. |
|
Construction of
Series of check dam Jiruliya Nala and Bhramri Nala under Block – Jama,
District - Dumka |
----- |
09.12.11 at 5.00pm. |
|
Construction of
series of check dam Ero Nala under Block-Kathikund Disrtict- Dumka |
----- |
07.12.11 at 5.00pm. |
|
Construction of
Series of check at Butwaria nala under Block-Raneshwar District- Dumka
|
----- |
07.12.11 at 5.00pm. |
|
Construction of
Series of check dam Baskidih Nala & Nijhor Nala, Block – Masaliya,
District - Dumka |
----- |
09.12.11 at 5.00pm. |
|
Construction of
check dam Pathithan, Thadhi, Bhurisimal, Bankdih, Podaidih Sighni under
block-Dumka , Dristrict- Dumka |
----- |
09.12.11 at 5.00pm. |
|
Construction of
Series of check dam Nawadih & Gobindpur under block- Saraiyahat,
District - Dumka |
----- |
09.12.11 at 5.00pm. |
|
Construction of
series of check dam at Dumuhani Nala under Block-Dumka Disrtict- Dumka |
----- |
08.12.11 at 5.00pm. |
|
Construction of
check dam at palajori and Bihajori under Block-Jarmundi |
----- |
08.12.11 at 5.00pm. |
|
Construction of
Fall at Km 5.50 of Bagodar Branch Canal Under Konar irrigation Project |
----- |
26.11.11 at 5.00pm. |
|
Construction of
Aqueduct at Km 39.250 of Bagodar Branch Canal Under Konar irrigation
Project |
----- |
26.11.11 at 5.00pm. |
|
Corrigendum (
Irrigation ) 46208 |
----- |
21.11.11 at 5.00pm. |
|
Strengthening of
A.M.C. |
----- |
17.11.11 at 5.00pm. |
|
Corrigendum (
Irrigation ) 46208 |
----- |
--- |
|
Corrigendum (
Irrigation ) 46024 |
----- |
|
|
Construction of T –
Beam Elephant Corridor |
----------- |
09.11.11 at 5.00pm. |
|
WRD 45823
(Irrigation) |
----------- |
----- |
|
eProcurement
Cancellation Notice |
----------- |
----- |
|
Corrigendum (
Irrigation ) 45992 |
----------- |
----- |
|
Corrigendum (
Irrigation ) 45824 |
----------- |
----- |
|
Construction of
Check Dam |
----------- |
05.11.11 at 5.00pm. |
|
Construction of
Check Dam |
----------- |
12.11.11 at 5.00pm. |
|
Residual Earth Work |
----------- |
11.11.11 at 5.00pm. |
|
Construction of
Check Dam |
----------- |
12.11.11 at 5.00pm. |
|
Earth Work, Structures and P.C.C. lining work |
----------- |
04.11.11 at 5.00pm. |
|
Construction of
Check Dam |
04.11.11 to 11.11.11 |
11.11.11 at
3.00pm. |
|
Construction of
Check Dam |
04.11.11 to 11.11.11 |
11.11.11 at
3.00pm. |
|
Construction of
Community Building |
04.11.11 to 11.11.11 |
12.11.11 at
3.00pm. |
|
Improvement of
riding quality |
--- |
04.11.11 at 5.00pm. |
|
Earth Work, Lining
and Structures |
--- |
04.11.11 at 5.00pm. |
|
Residual
E/WP.C.C.Lining |
--- |
07.11.11 at 5.00pm. |
|
Corrigendum
(Irrigation) 45694 |
--- |
----- |
|
For lining work |
--- |
03.11.11 at 5.00pm. |
|
Construction of
Check Dam |
--------- |
05.11.11 at 5.00pm. |
|
Corrigendum
(irrigation) 45175 |
--------- |
--- |
|
Construction of Check
Dam |
--------- |
28.10.2011 at
05.00 pm. |
|
Construction of Check
Dam |
--------- |
28.10.2011 at
05.00 pm. |
|
Construction of Check
Dam |
--------- |
28.10.2011 at
05.00 pm. |
|
Construction of
Concrete Lining Work |
--------- |
18.10.2011 at
05.00 pm. |
|
Construction of Road |
--------- |
18.10.2011 at
05.00 pm. |
|
Construction of Check
Dam |
12.10.11 to 18.10.11 |
19.10.2011 at
03.30 pm. |
|
Construction of
Aqueduct |
--------- |
14.10.2011 at
05.00 pm. |
|
Construction of
Earth Work Lining |
--------- |
14.10.2011 at
05.00 pm. |
|
Construction of
check dam |
--------- |
11.10.2011 at
05.00 pm. |
|
Construction of
check dam |
17.09.2011 to 23.09.2011 |
24.09.2011 at
05.00 pm. |
|
Earth Work, Lining
and Structures in OR-26 Govindpur |
------ |
27.09.2011 at
05.00 pm. |
|
CONSTRUCTION OF
P.C.C. LINING |
------ |
30.09.2011 at
05.00 pm. |
|
Construction of
T-Beam Elephant corridor |
------ |
30.09.2011 at
05.00 pm. |
|
CONSTRUCTION OF
P.C.C. LINING |
------ |
30.09.2011 at
05.00 pm. |
|
Construction
of Twin Box Duct Elephant Corridor |
------ |
24.09.2011 at
03.00 pm. |
|
Construction of T –
Beam Elephant Corridor |
------ |
24.09.2011 at
03.00 pm. |
|
Construction of Chek
Dam |
------ |
26.09.2011 at
03.00 pm. |
|
Construction of Chek
Dam |
------ |
24.09.2011 at
03.00 pm. |
|
Construction of Chek
Dam |
------ |
26.09.2011 at
03.00 pm. |
|
Construction of Chek
Dam |
------ |
24.09.2011 at
03.00 pm. |
|
Construction
of Residual earth work |
------ |
22.09.2011 at
03.00 pm. |
|
construction
of common facilities centre |
16.09.2011 to 22.09.2011 |
23.09.2011 at
03.00 pm. |
|
Construction of Road |
05.09.2011 to 07.09.2011 |
08.09.2011 at
03.00 pm. |
|
Construction of
Building |
12.09.2011 to 16.09.2011 |
17.09.2011 at
03.00 pm. |
|
Construction of
Water Supply Scheme |
05.09.2011 to 08.09.2011 |
10.09.2011 at
03.00 pm. |
|
Envisaging
Construction of Barrages |
----------- |
18.08.2011 at
05.00 pm. |
|
Construction of Chek
Dam |
----------- |
24.08.2011 at
05.00 pm. |
|
Construction of Chek
Dam |
----------- |
24.08.2011 at
05.00 pm. |
|
Construction of Chek
Dam |
----------- |
23.08.2011 at
05.00 pm. |
|
Construction of Road |
08.08.2011 to 10.08.2011 |
11.08.2011 at
05.00 pm. |
|
Contraction of Pond |
06.08.2011 to 09.08.2011 |
10.08.2011 at
05.00 pm. |
|
Construction of Road |
06.08.2011 to 12.08.2011 |
13.08.2011 at
05.00 pm. |
|
Construction of Chek
Dam |
--------- |
20.08.2011 at
05.00 pm. |
|
Construction of Chek
Dam |
--------- |
20.08.2011 at
05.00 pm. |
|
Construction of Chek
Dam |
--------- |
17.08.2011 at
05.00 pm. |
|
Construction of Chek
Dam |
--------- |
17.08.2011 at
05.00 pm. |
|
Construction of Chek
Dam |
--------- |
17.08.2011 at
05.00 pm. |
|
Construction of Chek
Dam |
--------- |
11.08.2011 at
05.00 pm. |
|
Construction of Chek
Dam |
--------- |
11.08.2011 at
05.00 pm. |
|
Construction of
Elephant Corridor |
--------- |
30.07.2011 at
03.30 pm. |
|
Construction of
Residual Work |
--------- |
30.07.2011 at
03.30 pm. |
|
Construction of
Common facility centre |
06.07.2011 to 11.07.2011 |
12.07.2011 at
03.30 pm. |
|
Construction of Dam |
----- |
07.07.2011 at
03.30 pm. |
|
Construction of Dam |
----- |
07.07.2011 at
03.30 pm. |
|
Construction of Dam |
07.06.2011 to 13.06.2011 |
14.06.2011 at
03.30 pm. |
|
Construction of
Residual earth |
---------- |
14.06.2011 at
03.30 pm. |
|
Construction of Road |
31.05.2011 to 06.06.2011 |
07.06.2011 at
03.30 pm. |
|
Construction of
check dam |
06.06.2011 |
07.06.2011 at
03.00 pm. |
|
Construction of
Elephant Corridor |
-------------- |
31.05.2011 at
03.00 pm. |
|
Irrigation work |
28.04.2011 to 02.05.2011 |
03.05.2011 at
03.00 pm. |
|
Construction of
Check Dam |
15.04.2011 to 18.04.2011 |
19.04.2011 at
03.00 pm. |
|
Construction of pond |
18.04.2011 to 20.04.2011 |
21.04.2011 at
03.00 pm. |
|
Construction of
Check Dam |
18.04.2011 to 26.04.2011 |
27.04.2011 at
03.00 pm. |
|
Irrigation work |
07.04.2011 to 09.04.2011 |
11.04.2011 at
03.00 pm. |
|
Construction of pond |
15.04.2011 to 20.04.2011 |
21.04.2011 at
03.00 pm. |
|
Construction of
Check Dam |
08.04.2011 to 09.04.2011 |
11.04.2011 at
03.00 pm. |
|
Construction of
Check Dam |
01.04.2011 to 10.04.2011 |
11.04.2011 at
03.00 pm. |
|
Construction of
Hostel Building |
02.04.2011 to 08.04.2011 |
09.04.2011 at
03.00 pm. |
|
Irrigation work |
02.04.2011 to 08.04.2011 |
09.04.2011 at
03.00 pm. |
|
Irrigation work |
26.03.2011 to 29.03.2011 |
30.03.2011 at
03.00 pm. |
|
Reinstallation of
irrigation schemes |
18.03.2011 to 23.03.2011 |
24.03.2011 at
03.00 pm. |
|
Reinstallation of
irrigation schemes |
21.03.2011 to 23.03.2011 |
24.03.2011 at
03.00 pm. |
|
Irrigation work |
22.03.2011 to 24.03.2011 |
26.03.2011 at
03.00 pm. |
|
Irrigation work |
18.03.2011 to 23.03.2011 |
24.03.2011 at
03.00 pm. |
|
Repair work |
29.03.2011 to 04.04.2011 |
05.04.2011 at
03.00 pm. |
|
Construction of
Check Dam |
30.03.2011 to 04.04.2011 |
05.04.2011 at
03.00 pm. |
|
Construction of
Check Dam |
21.03.2011 to 24.03.2011 |
25.03.2011 at
03.00 pm. |
|
Construction of
Check Dam |
21.03.2011 to 23.03.2011 |
24.03.2011 at
03.00 pm. |
|
Construction of
Check Dam |
21.03.2011 to 23.03.2011 |
24.03.2011 at
03.00 pm. |
|
Construction of
Check Dam |
17.03.2011 to 22.03.2011 |
23.03.2011 at
03.00 pm. |
|
Construction of
Check Dam |
05.03.2011 to 08.03.2011 |
09.03.2011 at
03.00 pm. |
|
Repair work |
03.03.2011 to 07.03.2011 |
08.03.2011 at
03.00 pm. |
|
Repair work |
05.03.2011 to 08.03.2011 |
09.03.2011 at
03.00 pm. |
|
Reinstallation Work |
01.03.2011 to 04.03.2011 |
05.03.2011 at
03.00 pm. |
|
Repair of Pond |
01.03.2011 to 04.03.2011 |
05.03.2011 at
03.00 pm. |
|
Construction of
Check Dam |
07.03.2011 to 09.03.2011 |
10.03.2011 at
03.00 pm. |
|
Construction of
Check Dam |
28.02.2011 to 03.03.2011 |
04.03.2011 at
03.00 pm. |
|
Construction of
Check Dam |
------------ |
--------------- |
|
Construction of
Check Dam |
01.03.2011 to 07.03.2011 |
08.03.2011 at
03.00 pm. |
|
Construction of
Check Dam |
25.02.2011 to 04.03.2011 |
05.03.2011 at
03.00 pm. |
|
Construction of
Check Dam |
01.03.2011 to 08.03.2011 |
09.03.2011 at
03.00 pm. |
|
Construction of
redidual |
01.03.2011 to 07.03.2011 |
08.03.2011 at
03.00 pm. |
|
Construction of
Check Dam |
08.03.2011 to 14.03.2011 |
15.03.2011 at
03.00 pm. |
|
Construction of
Check Dam |
23.02.2011 to 28.02.2011 |
01.03.2011 at
03.00 pm. |
|
Construction of
canal |
03.03.2011 to 10.03.2011 |
11.03.2011 at
03.00 pm. |
|
Implementing of
e-Tendering System |
---------- |
------------ |
|
Construction of
Check Dam |
23.02.2011 to 28.02.2011 |
01.02.2011 at
03.00 pm. |
|
Construction of
Check Dam |
19.02.2011 to 24.02.2011 |
25.02.2011 at
03.00 pm. |
|
Construction of
Check Dam |
19.02.2011 to 24.02.2011 |
25.02.2011 at
03.00 pm. |
|
Construction of
Check Dam |
23.02.2011 to 28.02.2011 |
01.03.2011 at
03.00 pm. |
|
Construction of
Check Dam |
01.03.2011 to 07.03.2011 |
08.03.2011 at
03.00 pm. |
|
Construction of
Check Dam |
05.03.2011 to 10.03.2011 |
11.03.2011 at
03.00 pm. |
|
Construction of
Check Dam |
23.02.2011 to 28.02.2011 |
01.03.2011 at
03.00 pm. |
|
Construction of
Check Dam |
21.02.2011 to 25.02.2011 |
26.02.2011 at
03.00 pm. |
|
Construction of
Check Dam |
17.02.2011 to 22.02.2011 |
23.02.2011 at
03.00 pm. |
|
Construction of
Check Dam |
19.02.2011 to 24.02.2011 |
25.02.2011 at
03.00 pm. |
|
Construction of
Hostel Building |
12.02.2011 to 18.02.2011 |
19.02.2011 at
03.00 pm. |
|
Reinstallation of
irrigation schemes |
15.02.2011 to 22.02.2011 |
23.02.2011 at
03.00 pm. |
|
Construction of Dam |
03.02.2011 to 10.02.2011 |
11.02.2011 at
03.00 pm. |
|
Repair of Pond |
27.01.2011 to 31.01.2011 |
01.02.2011 at
03.00 pm. |
|
Construction of Dam |
27.01.2011 to 01.02.2011 |
02.02.2011 at
03.00 pm. |
|
construction of Well |
19.01.2011 to 21.01.2011 |
22.01.2011 at
03.00 pm. |
|
Reconstruction of
Dam |
21.01.2011 to 24.01.2011 |
25.01.2011 at
03.00 pm. |
|
Reconstruction of
irrigation scheme |
29.01.2011 to 04.02.2011 |
05.02.2011 at
03.00 pm. |
|
Reconstruction of
irrigation scheme |
24.01.2011 to 28.01.2011 |
29.01.2011 at
03.00 pm. |
|
Construction
of Checkdam |
17.01.2011 to 20.01.2011 |
21.01.2011 at
03.00 pm. |
|
Repair
of Dam |
21.01.2011 to 27.01.2011 |
28.01.2011 at
03.00 pm. |
|
Construction
of Earthen Dam |
21.01.2011 to 27.01.2011 |
28.01.2011 at
03.00 pm. |
|
Construction
of Storage Room |
24.01.2011 to 28.01.2011 |
29.01.2011 at
03.00 pm. |
|
Construction
of Series of Checkdam |
21.01.2011 to 28.01.2011 |
29.01.2011 at
03.00 pm. |
|
Construction
of Agriculture Information Centre |
24.01.2011 to 27.01.2011 |
28.01.2011 at
03.00 pm. |
|
Irrigation Work |
10.01.2011 to 14.01.2011 |
15.01.2011 at
03.00 pm. |
|
Construction
of Series of Checkdam |
10.01.2011 to 14.01.2011 |
15.01.2011 at
03.00 pm. |
|
Construction of WBM
metal Service Road |
20.01.2011 to 31.01.2011 |
01.02.2011 at
03.00 pm. |
|
Construction of
Service Road |
11.01.2011 to 17.01.2011 |
18.01.2011 at
03.00 pm. |
|
Contraction of Dam |
15.01.2011 to 19.01.2011 |
20.01.2011 at
03.00 pm. |
|
Construction
of Series of Checkdam |
15.01.2011 to 21.01.2011 |
22.01.2011 at
03.00 pm. |
|
Const.
of Residual E/W |
10.01.2011 to 17.01.2011 |
18.01.2011 at
03.00 pm. |
|
Construction
of Series of Checkdam |
03.01.2011 to 10.01.2011 |
11.01.2011 at
03.00 pm. |
|
Construction
of Road |
10.01.2011 to 17.01.2011 |
18.01.2011 at
03.00 pm. |
|
Construction
of Agriculture Information Center |
10.01.2011 to 12.01.2011 |
13.01.2011 at
03.00 pm. |
|
Construction
of Series of Checkdam |
12.01.2011 to 17.01.2011 |
18.01.2011 at
03.00 pm. |
|
Construction
of Series of Checkdam |
01.01.2011 to 07.01.2011 |
8.01.2011 at
03.00 pm. |
|
Construction
of Series of Checkdam |
12.01.2011 to 17.01.2011 |
18.01.2011 at
03.00 pm. |
|
Construction
of Series of Checkdam |
11.01.2011 to 15.01.2011 |
17.01.2011 at
03.00 pm. |
|
Construction
of Series of Checkdam |
28.12.2010 to 03.01.2011 |
04.01.2011 at
03.00 pm. |
|
Construction
of Check Dam |
29.12.2010 to 03.01.2011 |
04.01.2011 at
03.00 pm. |
|
Construction
of Check Dam at Kanchi Nala |
29.12.2010 to 03.01.2011 |
04.01.2011 at
03.00 pm. |
|
Lining work at
Chandil Dam |
28.12.2010 to 03.01.2011 |
04.01.2011 at
03.00 pm. |
|
Construction of
Check Dam |
31.12.2010 to 06.01.2011 |
07.01.2011 at
03.00 pm. |
|
Construction of
Check Dam |
28.12.2010 to 03.01.2011 |
04.01.2011 at
03.00 pm. |
|
Construction of
Check Dam |
27.12.2010 to 03.01.2011 |
04.01.2011 at
03.00 pm. |
|
Construction of
Check Dam |
03.01.2011 to 06.01.2011 |
07.01.2011 at
03.00 pm. |
|
Construction of
Check Dam |
27.12.2010 to 03.01.2010 |
04.01.2011 at
03.00 pm. |
|
Construction of
Check Dam |
14.12.2010 to 20.12.2010 |
21.12.2010 at
03.00 pm. |
|
Construction of
Check Dam |
22.12.2010 to 29.12.2010 |
30.12.2010 at
03.00 pm. |
|
Lining &
Reinstallation work of Dam |
27.12.2010 to 04.01.2011 |
05.01.2011 at
03.00 pm. |
|
Implementation of
e-Procurement System |
------ |
23.12.2010 at
11.00 am. |
|
Construction of
Bridge |
23.12.2010 to 27.12.2010 |
28.12.2010 at 3.00 pm. |
|
Construction of
Tajna Reservoir Scheme |
20.12.2010 to 27.12.2010 |
29.12.2010 at 3.00 pm. |
|
Irrigation work |
30.11.2010 to 06.12.2010 |
07.12.2010 at 3.00 pm. |
|
Survey of
MAYURAKSHI irrigation project |
--- |
29.11.2010 at 3.00 pm. |
|
Construction of Residual Earth Work |
16.11.2010 to 22.11.2010 |
23.11.2010 at 3.00 pm. |
|
Construction of Check Dam |
18.11.2010 to 24.11.2010
|
25.11.2010 at 3.00 pm. |
|
Construction of Residual work of approach
Channel (112 M) Intake Structure |
18.11.2010 to 24.11.2010
|
25.11.2010 at 3.00 pm. |
|
Construction of One Way Bridge |
18.10.2010 to 25.10.2010 |
6.10.2010 at
3.00 pm. |
|
Construction of Chek Dam |
25.09.2010 to 05.10.2010 |
06.10.2010 at
3.00 pm. |
|
Repairment work |
29.09.2010 to 05.10.2010 |
06.10.2010 at
3.00 pm. |
|
Construction of Earthen Dam |
23.09.2010 to 30.09.2010 |
01.10.2010 at
3.00 pm. |
|
Anti erosion work |
16.09.2010 to 27.09.2010 |
28.09.2010 at
3.00 pm. |
|
repair / replacement, erection, testing and commissioning of under water
and Surface gates. |
17.08.2010 to 23.08.2010 |
25.08.2010 at
3.00 pm. |
|
Construction of Dam
|
29.07.2010 to 04.08.2010 |
05.08.2010 at
3.00 pm. |
|
Remaining Water Work
|
09.07.2010 to 15.07.2010 |
16.07.2010 at
3.00 pm. |
|
Irrigation
work
|
26.07.2010 to 05.08.2010 |
06.08.2010 at
3.00 pm. |
|
Construction
of Series of Check Dam
|
25.06.2010 to 30.06.2010 |
01.07.2010 at
3.00 pm. |
|
Residual
Earth Work
|
12.06.2010 to 28.06.2010 |
29.06.2010 at
3.00 pm. |
|
Construction
of Flush spillway, spill channel
|
10.06.2010 to 14.06.2010 |
15.06.2010 at
3.00 pm. |
|
Concrete
lining work
|
16.06.2010 to 23.06.2010 |
24.06.2010 at
3.00 pm. |
|
P.C.C.
Lining in cutting zone between Km. 32.444 to Km. 35.154 of SLMC.
|
19.06.2010 to 23.06.2010 |
24.06.2010 at
3.00 pm. |
|
Construction
of Series of Check Dam
|
11.06.2010 to 17.06.2010 |
18.06.2010 at
3.00 pm. |
|
Construction
of Series of Check Dam
|
12.05.2010 to 17.05.2010 |
15.05.2010 at
3.00 pm. |
|
Irrigation
work
|
04.05.2010 to 11.05.2010 |
12.05.2010 at
3.00 pm. |
|
Irrigation
work
|
17.05.2010 to 20.05.2010 |
21.05.2010 at
3.00 pm. |
|
Construction
of Series of Check
|
20.04.2010 to 26.04.2010 |
27.04.2010 at
3.00 pm. |
|
Irrigation
work
|
20.04.2010 to 27.04.2010 |
28.04.2010 at
3.00 pm. |
|
Extension
of Barrel of C.D. work
|
22.04.2010 to 28.04.2010 |
29.04.2010 at
3.00 pm. |
|
Construction of Dam
|
17.04.2010 to 21.04.2010 |
22.04.2010 at
3.00 pm. |
|
Construction of Parallel Channel
|
13.04.2010 to 19.04.2010 |
20.04.2010 at
3.00 pm. |
|
Expansion
of Interest
|
29.04.2010 to 05.05.2010 |
06.05.2010 at
3.00 pm. |
|
Construction
of Dam
|
10.04.2010 to 15.04.2010 |
16.04.2010 at
3.00 pm. |
|
Construction
of Check Dam
|
05.04.2010 to 13.04.2010
|
15.04.2010 at
3.00 pm. |
|
Construction
of Dam
|
03.04.2010 to 08.04.2010 at 3.00 pm.
|
09.04.2010 at
3.00 pm.
|