Drinking Water and Sanitation Department
[Government of Jharkhand]

Particulars

Last date of sale

Last date of submission

Construction of Water Treatment Plant

----

26.05.12

Construction of Water Treatment Plant

----

04.06.12

Construction of Tubewell

----

28.05.12

Construction of Water Treatment Plant

----

21.05.12

Shifting & Laying of Pipe 

----

21.05.12

Supply of Water

----

21.05.12

Supplying, Shifting & Laying of Pipe

----

30.04.12

Construction of Water Treatment Plant

----

08.05.12

Supply of Water

----

03.05.12

Construction of Water Treatment Plant

----

27.04.12 at  1.00 pm..

Corrigendum D.W 50502

----

25.04.12 at  3.30 pm..

Construction of Water Treatment Plant

----

24.04.12 at  3.30 pm..

Supplying, Shifting & Laying of Pipe

----

18.04.12 at  3.30 pm..

Corrigendum D.W 50337

----

----

Construction of Water Treatment Plant

----

16.04.12 at  4.00 pm..

Construction of Mini Rural Pipe

----

18.04.12 at  3.30 pm..

Construction of Tube Well

----

06.04.12 at 5.00 pm..

Construction of Tube Well

----

09.04.12 at 3.30 pm..

Construction of Tube Well

----

10.04.12 at 3.30 pm..

Construction of Mini Rural Pipe

----

30.03.12 at 3.30 pm..

Installation of Motor Pipe Set

----

10.04.12 at 3.00 pm..

Construction of Intake Well

----

30.03.12 at 4.00 pm..

Supply of Standard Tool Kit

----

30.03.12 at 3.30 pm..

Construction of Water Treatment Plant

----

28.03.12 at 5.00 pm..

Construction of Water Treatment Plant

----

27.03.12 at 3.30 pm.

Construction of Water Treatment Plant

----

26.03.12 at 3.30 pm.

Supply of Pipe

----

26.03.12 at 3.00 pm.

Construction of Water Treatment Plant

----

19.03.12 at 3.30 pm.

Construction of Mini Rural Pipe

----

22.03.12 at 3.30 pm.

Supply of Water

----

23.03.12 at 5.00 pm.

Construction of Mini Rural Pipe

----

19.03.12 at 5.00 pm.

Corrigendum D.W 49541

----

----

Construction of Water Treatment Plant

----

16.03.12 at 5.00 pm.

Construction of Mini Rural Pipe

----

15.03.12 at 5.00 pm.

Detailed survey, design and drawing

----

12.03.12 at 5.00 pm.

Detailed survey, design and drawing

----

09.03.12 at 5.00 pm.

Supply of materials

----

12.03.12 at 5.00 pm.

Construction of Water Treatment Plant

----

14.03.12 at 5.00 pm.

Construction of Water Treatment Plant

----

02.03.12 at 5.00 pm.

Construction of Rain Water Harvesting

----

05.03.12 at 5.00 pm.

Corrigendum D.W 48681

----

----

Construction of Water Treatment Plant

----

02.03.12 at 5.00 pm.

Construction of Water Treatment Plant

----

02.03.12 at 5.00 pm.

Construction of Water Treatment Plant

----

02.03.12 at 5.00 pm.

Construction of Water Treatment Plant

----

01.03.12 at 5.00 pm.

Construction of Mini Rural Pipe

----

22.02.12 at 5.00 pm.

Construction of Water Treatment Plant

----

21.02.12 at 5.00 pm.

IEC Management Consultant

----

14.02.12 at 5.00 pm.

training in Rural Water and Sanitation Sector 

----

14.02.12 at 5.00 pm.

Interest for concurrent evaluation of NRDWP

----

14.02.12 at 5.00 pm.

Preparation of Detailed Project Report

----

17.02.12 at 5.00 pm.

installation and commissioning of raw water pumping equipments

----

13.02.12 at 5.00 pm.

Construction of Mini Rural Pipe

----

09.02.12 at 5.00 pm.

Corrigendum D.W 48471

----

----

Construction of Water Treatment Plant

----

07.02.12 at 5.00 pm.

construction of E.S.R. and pipe line networks

----

13.02.12 at 5.00 pm.

Construction of Mini Rural Pipe

----

06.02.12 at 5.00 pm.

Construction of Mini Rural Pipe

----

31.01.12 at 3.30 pm.

Construction of Mini Rural Pipe

----

31.01.12 at 3.30 pm.

Construction of Mini Rural Pipe

----

31.01.12 at 3.30 pm.

Construction of Mini Rural Pipe

----

31.01.12 at 3.30 pm.

Cancellation (D.W) 45369

----

--

Construction of Tube Well

----

03.02.12 at 5.00 pm.

Construction of Mini Rural Pipe Water Supply Scheme

----

31.01.12 at 5.00 pm.

Supplying, laying and jointing D.I.k.- 7

----

01.02.12 at 5.00 pm.

Construction of Rural Water Treatment Plant

----

31.01.12 at 5.00 pm.

Construction of Rural Water Supply Scheme

----

27.01.12 at 5.00 pm.

Construction of Rural Water Supply Scheme

----

27.01.12 at 5.00 pm.

Construction of Tube Well

----

27.01.12 at 5.00 pm.

supply of potable drinking water

----

24.01.12 at 5.00 pm.

Cancellation 47313 (Water)

----

---

Construction of Tube Well

----

19.01.12 at 5.00 pm.

Construction of Tube Well

----

27.12.11 at 5.00 pm.

Corrigendum D.W 45807

----

----

Corrigendum D.W 46176

----

----

Corrigendum D.W 46941

----

20.12.11

Corrigendum D.W 47313

----

--

Corrigendum D.W 47176

----

--

Corrigendum D.W 46918

----

21.12.11 at 5.00 pm.

Supplying, fitting and fixing of IM-II Hand pump

27.12.11

28.12.11 at 3.30 pm.

Corrigendum 47182 (Water)

---

---

Setting up Community based Iron Removal plants

---

16.12.11 at 3.30 pm.

Construction of Mini Pipe rural water supply scheme Pump House

---

15.12.11 at 3.30 pm.

Construction of Mini Rural Pipe W/S Scheme

---

21.12.11 at 3.30 pm.

Construction of Tube Well

---

21.12.11 at 5.00 pm.

Construction of Tube Well

---

26.12.11 at 5.00 pm.

Corrigendum (Water-47053)

---

---

Construction of Tube Well

---

---

Construction of Tube Well

---

26.12.11 at 5.00 pm.

Changing of Pipe

12.12.11 at 5.00 pm.

14.12.11 at 3.30 pm.

Detailed survey, design and drawing

-----------.

15.12.11 at 4.00 pm.

Construction of Tube Well

-----------.

19.12.11 at 5.00 pm.

Construction of Tube Well

-----------.

----

Corrigendum (Water) 46643 & 46763

-----------.

----

Construction of Tube Well

-----------.

11.12.11 at 5.00 pm.

Corrigendum (Water) 46643

-----------.

---------------

Cancellation (Water) 46570

-----------.

---------------

construction of Intake Well

24.11.11 to 07.12.11 at 5.00 pm.

20.12.11 at 3.30 pm.

Construction of Tube Well

----

---

Construction of Tube Well

----

12.12.11 at 5.00 pm.

Mini Water Supply Scheme

----

10.12.11 at 5.00 pm.

Cancellation (Water) 46217

----

----

Construction of Tube Well

30.11.11 at 5.00 pm.

01.12.11 at 3.30 pm.

Construction of Tube Well

24.11.11 at 5.00 pm.

25.11.11 at 3.30 pm.

Construction of ESR

-------------

25.11.11 at 3.00 pm.

Construction of 200x150 mm dia High Yield Tube Well

17.11.11 at 5.00pm.

18.11.11 at 3.30 pm.

Construction of 125x115mm dia High Yield Tube Well

04.11.11 at 5.00pm.

05.11.11 at 3.30 pm.

Construction of 200x150mm dia High Yield Tube Well

21.11.11 at 5.00pm.

22.11.11 at 3.30 pm.

Construction of Mini Pipe rural water supply scheme Pump House,

11.11.11 at 5.00pm.

12.11.11 at 3.30 pm.

Construction of 200x150mm dia High Yield Tube Well

17.11.11 at 5.00pm.

19.11.11 at 3.00 pm.

Construction of Mini rural water supply scheme Pump House

09.11.11 at 5.00pm.

11.11.11 at 3.30 pm.

Corrigendum 45934 (Drinking Water)

-----------

--------

Laying of DI pipe line along Adityapur Kandra main road due to widening of Adityapur-Kandra Road

-----------

19.11.11 at 5.00 pm.

Supply of Water

09.11.11 at 5.00pm.

10.11.11 at 3.30 pm.

Corrigendum (D.W) 45468

----

----

Corrigendum (D.W) 45350

----

-----

Corrigendum (D.W) 45475

----

-----

Corrigendum (D.W) 45349

----

-----

Corrigendum (D.W) 45351

----

-----

Corrigendum (D.W) 45474

----

-----

Reinstallation of Tube Well

03.11.11 at 5.00pm.

04.11.11 at 3.30 pm.

Reinstallation of Tube Well

03.11.11 at 5.00pm.

04.11.11 at 3.30 pm.

Reinstallation of Tube Well

03.11.11 at 5.00pm.

04.11.11 at 3.30 pm.

Construction of depth High Yield Drilled Tube Well

11.11.11 at 5.00pm.

12.11.11 at 3.30 pm.

Special repair of Road

-----------

27.10.11 at 3.00 pm.

Corrigendum (D.W) 45476

-----------

-----------

Corrigendum (D.W) 45284

-----------

-----------

Corrigendum (D.W) 45435

-----------

-----------

Corrigendum (D.W) 44901

-----------

-----------

Corrigendum (D.W) 45465

-----------

-----------

Construction of Tube Well

08.11.11 at 5.00pm.

09.11.11 at 03.30pm.

Construction of Tube Well

04.11.11 at 5.00pm.

05.11.11 at 03.30pm.

Corrigendum 45476

----

-----

Corrigendum 45403

----

-----

Changes in water treatment plant

27.10.11

29.10.11 at 3.30 pm.

Corrigendum 45468

----

----

Construction of Drinking Water

21.10.11 at 5.00 pm.

22.10.11  at 03.30 pm.

Construction of Drinking Water

21.10.11 at 5.00 pm.

22.10.11  at 03.30 pm.

Construction of Drinking Water

21.10.11 at 5.00 pm.

22.10.11  at 03.30 pm.

Construction of Drinking Water

21.10.11 at 5.00 pm.

22.10.11  at 03.30 pm.

Construction of Drinking Water

21.10.11 at 5.00 pm.

22.10.11  at 03.30 pm.

Construction of Soak Pit for Tube well drain

21.10.11 at 5.00 pm.

22.10.11  at 03.30 pm.

Structural changes of the tubewell

20.10.11 at 5.00 pm.

21.10.11  at 03.30 pm.

Construction of Soak Pit for Tube well drain

21.10.11 at 5.00 pm.

22.10.11  at 03.30 pm.

Construction of Mini Rural Pipe

13.10.11 at 5.00 pm.

14.10.11  at 03.30 pm.

Construction of Water Treatment Plant

13.10.11 at 5.00 pm.

14.10.11  at 03.30 pm.

Construction of Water Tank

11.10.11 at 5.00 pm.

12.10.11  at 03.00 pm.

Repair of Water Treatment Plant

13.10.11 at 5.00 pm.

14.10.11  at 03.30 pm.

Repair of Water Treatment Plant

13.10.11 at 5.00 pm.

14.10.11  at 03.30 pm.

Repair of Water Treatment Plant

13.10.11 at 5.00 pm.

14.10.11  at 03.00 pm.

Construction of Water Treatment Plant

---

21.10.11  at 04.00 pm.

Construction of Water Treatment Plant

13.10.11 at 5.00 pm.

14.10.11  at 03.30 pm.

Construction of Water Treatment Plant

13.10.11 at 5.00 pm.

14.10.11  at 03.30 pm.

Construction of Mini Rural Pipe W/S Scheme

11.10.11 at 5.00 pm.

12.10.11  at 03.30 pm.

Supply of Water

21.10.11 at 4.00 pm.

24.10.11  at 03.00 pm.

Supply of Water

15.10.11 at 5.00 pm.

18.10.11  at 03.30 pm.

Construction of Mini Rural Pipe Water Supply Scheme


10.10.11 at 5.00 pm.

12.10.11  at 03.30 pm.

Re-allocation of defunct T/W


13.10.11 at 5.00 pm.

14.10.11  at 03.30 pm.

Construction of Mini Rural Pipe Water Supply Scheme


10.10.11 at 5.00 pm.

12.10.11  at 03.30 pm.

Re-allocation of defunct T/W


13.10.11 at 5.00 pm.

14.10.11  at 03.30 pm.

Re-installation of water treatment plant


27.09.11 at 5.00 pm.

29.09.11  at 03.30 pm.

Construction of Tube Well


12.09.11 at 4.00 pm.

13.09.11  at 03.30 pm.

Construction of Water Tank


09.09.11 at 4.00 pm.

10.09.11  at 03.30 pm.

Construction of Water Treatment  Plant


23.08.11 at 4.00 pm.

24.08.11  at 03.30 pm.

Supply of Water


02.08.11 at 4.00 pm.

03.08.11  at 03.30 pm.

Supply of Water


18.07.11

19.07.11  at 03.30 pm.

Construction of Water Treatment  Plant


18.06.11

20.06.2011 at 03.30 pm.

Operation and Maintenance of wash recovery system 


----

21.06.2011 at 11.30 am.

Construction of High Yield Tube Well


25.05.11

26.05.2011 at 11.30 am

Balance work of W.S.S at Giridih


---------

26.05.2011 at 11.30 am.

Construction of 2100 M3 21 MTR Staging RCC FSR


---------

30.05.2011 03.30 pm.

Construction of soak pit


25.05.11 to 30.05.11

26.05.2011 03.30 pm.

Construction of High Yield Tube Well


24.05.11 to 30.05.11

31.05.2011 at 11.30 am.

Construction of High Yield Tube Well

21.05.2011 at 5.00 pm.

24.05.2011 at 11.30 am.

Construction of Soak Pit for Tube well

22.05.2011 at 5.00 pm.

24.05.2011 at 4.00 pm.

Construction of Soak Pit for Tube well

22.05.2011 at 5.00 pm.

23.05.2011 at 4.00 pm.

Construction of Water Treatment Plant

21.05.2011 at 5.00 pm.

23.05.2011 at 4.00 pm.

Construction of Water Treatment Plant

22.05.2011 at 5.00 pm.

23.05.2011 at 4.00 pm.

Construction of Water Treatment Plant

21.05.2011 at 5.00 pm.

23.05.2011 at 4.00 pm.

Construction of Water Treatment Plant

----

24.05.2011 at 4.00 pm.

Supply of Water

----

14.05.2011 at 4.00 pm.

Supply of Water

03.05.2011 at 5.00 pm.

04.05.2011 at 4.00 pm.

Construction of High Yield Tube Well

27.04.2011 at 5.00 pm.

28.04.2011 at 3.30 pm.

Construction of High Yield Tube Well

25.04.2011 at 5.00 pm.

26.04.2011 at 3.30 pm.

Earth work excavation for Desilting of Chharwa Dam

17.04.2011 at 5.00 pm.

18.04.2011 at 4.00 pm.

Municipal Water Supply Arrangement

26.04.2011 at 5.00 pm.

28.04.2011 at 4.00 pm.

Construction of R.C.C. Pipe supporting pillars

26.04.2011 at 5.00 pm.

28.04.2011 at 4.00 pm.

Supply of Water

02.04.2011 to 02.04.2011

05.04.2011 at 3.30 pm.

Supply of Water

07.04.2011 at 5.00 pm.

08.04.2011 at 3.30 pm.

Supply of Water

04.04.2011 at 5.00 pm.

05.04.2011 at 3.30 pm.

Construction of Canal Pump House, Motor Pump & HDPE Water Tank

28.03.2011 at 5.00 pm.

29.03.2011 at 3.30 pm.

Earth work excavation for Desilting of Chharwa Dam

---------

15.03.2011 at 04.00 pm.

Project Formulations for water and sanitation schemes

---------

03.03.2011 at 04.00 pm.

Go Top

::  Ranchi Express  ::

:: Jharkhand Classifieds ::

:: Jhakhand Edu. ::

:: Jharkhand Jobs ::