Water Resources Division
[Government of Jharkhand]

GOVERNMENT OF JHARKHAND

OFFICE OF THE CHIEF ENGINEER

WATER RESOURCES DEPARTMENT MEDININAGAR, PIN- 822101

Short Tender Notice

(Two Envelope system)

N.I.T. No. 01/2008-09

 

1        Name of work                       :-          Construction of North Koel Pump Canal

with its all components (Head works and its Canal Networks)

2        Indicative estimated cost    :-          Rs. 12880.00 Lacs

3        Office inviting Tender/Bid.    :-          The Chief Engineer Water Resources

Department, Medininagar Pin- 822101

4        Period of Sale of Tender/Bid.

               Document                      :-          From 13.05.2008 to 15.05.2008

5        Date  of PRE BID Conference  :-          In the office of the Chief Enginner, Water

          Resources Department, Medininagar On 17.05.2008 at 11.30am.

6        Date and Time of Receipt of Bid.:-          22.05.2008 up to 3.00pm.

7        Date and Time  of Opening

          Technical Bid.                        :-           On 22.05.2008 at 03.30pm.

8        Place for sale of Tender/Bid Documents-

(A)           Chief Engineer, Water Resources Department, Medininagar.

(B)           Superintending Engineer, Design, Planning and Monitoring Circle Ranchi.

(C)           Superintending Engineer, Kadwan Dam Circle, Garhwa, Camp- Medininagar

 

9        Place for receipt and opening of Tender/Bid .- Chief Engineer, Water  Resources                                                       Department, Medininagar.

10 (i)  Earnest money of Rs. 257.60 Lacs ( Rupees Two Crores Fifty Seven Lacs and Sixty Thousand ) Only be attached in the form of Six year N.S.C (8th issue) or 3/5 years Post Office Time Deposit issued from the Post Office of Jharkhand or Bank Guarantee of any Schedule Bank as envisaged in finance department resolution no. 4-9/2001 (part-1) 295 dt. 24.01.2002 pledged to the Executive Engineer, Water Ways Division, Medininagar along with the “Technical Bid Envelope” only.

(ii)      Earnest money will be 2% of the estimate cost in the shape as mentioned in Para 10 (i) Contractor will have to deposit 5% of the total allotted amount of work as Security Deposit. Besides Earnest Money, balance 3% amount (Excluding E.M.) will have to be deposited at the time of  agreement.

11       Tenderer or his authorized representative may choose to be present at the time of Pre bid Conference/Opening of Technical Bid./Financial Bid.

12      Contractor who is not registered in W.R.D. Jharkhand but registered elsewhere and possesses experience of such work and fulfills the criteria for qualifying may also participate in tender with permission from Engineer- in Chief / Secretary of the Department. He shall however be required to be registered in the Department within two months from the date of award of work. At the time of buying the tender / bid documents the attested photocopy of present registration of required category, Income Tax clearance as per rule, Sales Tax clearance certificate, Labour license and character certificate must be attached with the application for issuing of Tender document.

13      The price of tender document is Rs. 10,000.00 (Rupees Ten thousand) only which is non refundable. The same may be in form of bank draft in favour of Executive Engineer, Water Ways Division Medininagar. Payable at S.B.I. Daltonganj    ( Medininagar ) .

14      The work is to be accomplished on “Item rate basis”. The project detail, drawings etc. available in the department may be seen in the office of the undersigned on any working day for reference only.

15      Works details to be executed are as follows:-

(i)       Head works of schemes consists of Construction of Intake Well of desired capacity, Pump house, Supply & Installation of Pumps & Motors , Construction of VAT with Electrical and Mechanical fittings and other fittings all complete job to provide 125 cusecs discharge at VAT.

(ii)      Construction of  RCC Trough Canal in length of about 1200 Meters from VAT then earthen lined channel distributaries minors and village channels (Water Courses) with all pertaining structures all complete.

(iii)     The scheme after completion will have to be commissioned and maintained and run by the contractor for one Kharif and one Rabi Irrigation depending on the availability of power

16               Time of completion will be 30 months strictly.

17     The minimum essential criteria for qualification of tendered work is as follows:-

(i)       the total turn over during preceding five financial year should not be less than 60% of the indicative cost of North Koel Pump Canal Scheme with the condition that in at least one financial year of the above period the annual turn-over for civil and mechanical works should not be less than 40% of the indicative cost of the North Koel Pump Canal Scheme.

(ii)      The tenderers must have experience of execution of civil and mechanical works of at least 60 crores cost over past five years.

(iii)     Ownership & dedicated availability of the key equipments/machines for the work. The tenderes must have ownership and dedicated availability of at least 12 Nos. Dumpers, 2 Nos. Dozers, 3 Nos. Hydraulic Excavator, 5 Nos. Rollers, 1 No. Batching Plant, 2 Nos. Transit Mixers and 2 Nos. of Plate Vibrators. They should furnish and affidavit in this regard.

18      Before submitting the tender, the tenderers are advised to visit the site (at their own cost) to get themselves apprised of the details and situation of the work site.

19      Tender is based on “Two Envelop Systems” The first envelop shall be marked as “Technical Bid” and the second one as “Financial  Bid”. “Financial Bid” of only technically qualified tenderers shall be opened . Joint ventures shall be permitted to participate in the Bid/Tender. These two sealed envelops will be kept in a bigger envelope super scribing  Name of the work, Name & Address of the tenderer.

20      The Department reserves the right to accept or reject any or all bid/tender without assigning any reason whatsoever.

21      The details of Terms and Condition of the tender may be seen in Tender/Bid Documents.

22      The Department will not normally supply/provide any construction equipments/tools and plants and construction materials needed for the execution of the above works

but materials previously available in the stock for the same project like steel and boulders will be supplied as per the present rate with storage charges and recovery will be made accordingly. Boulders which will be recovered out of excavation during construction will be compulsorily utilized by the contractor for construction work with suitable recovery as per departmental norms and as per circulars & specification.

23      Work has to be executed on the basis of guidelines and as per specification and norms of Water Resources Department, relevant I.S. code: IRC publication. CWC publications and circulars issued by the Government from time to time.

24      The Contractor is required to establish on its own all the requisite facilities such as accommodation, water supply, sanitation etc. for their work men and labours and also a fully equipped and functional Quality Control Laboratory at work site before Starting the execution of the work.

25      The estimated cost of the project mentioned in para 2 above is purely indicative only and should not be taken as granted as a guideline for design and execution. Tenderer are advised to go through the tender document carefully and attach the requisite amount of earnest money as mentioned therein. Before agreement successful bidder will have to deposit 5% of allotted amount of work as security deposit inclusive of E.M.

26      The tenderer shall have to plan his construction work program in line with the department program.

27      In case, the site of work either in part or in full is not provided to the contractor, either due to non-completion of land-acquisition processes or due to no-clearance of scheme by the forest department or on any account what so ever no claim on this account shall be payable to the contractor. However on account of this request of the contractor, suitable time extension shall be granted for completion of the work for which no claim will be entertained.

28      The Scheme after completion will have to be commissioned and maintained and run as functional by the executing agency for one Kharif and one Rabi irrigation depending on the availability of power.

29      No Claim for idle labour, men and machinery will be entertained for any reason, whatsoever.

30      Since the project cost is more than 100 crore and time of completion more than 12 months, Escalation of item rates are admissible. Rate of Escalation shall be calculated as per standard formula.  

31      Joint ventures are allowed to participate in tender.

32      Conditional Tenders shall not be accepted.

Chief Engineer

             Water Resources Department, Medininagar

               (ON BEHALF OF THE GOVERNOR OF JHARKHAND)

IPRD -22630 (Irrigation) 08-09

|| Feedback | About Us | Contact Us | Disclaimer ||