Details survey, design, construction Commissioning and
successfully running and maintaining for two years on turn-key basis under
KOPALI
rural pipe water supply scheme under D.W. & S. division SARAIKELA
Major components are as follows:
Intake well(5M diax25.5 m total depth) with pump chamber over intake
well.
(ii) Rising
main
250 -300mm dia DI pipe-1100M
(iii) Distribution
main
450mm dia to
100mm dia CI pipe-17265m
(iv) 6.00 MLD capacity W.T.P.
(v) 200000 gallon.E.S.R. on 18M staging
(vi) Construction of staff quarter, fencing work,etc.
(vii) Raw water pumping Machinery,
V.T.Pump
– 2 Nos.
Discharge
45 LPS, Head-30M
(viii) Clear water pumping Machinery
(a)
Centrifugal pump- 2 Nos
Discharge 45 LPS, Head 32 M.
(ix)Electrical Transformer.
(a)
100KVA
– 1 No.
63KVA- 1NO. &some other works as per detail
in BOQ |