Name of work
|
: Construction
of 01 (One) no. of High Level Bridges in Dumka District.
|
|
Sl. No.
|
Name of work
|
Length
|
Earnest Money
|
Cost of Bid
|
Time of Completion
|
|
1.
|
(i)
Construction of high level
Bridge with footpath over Mayurakshi river
in Raneshwar Block, Dist.- Dumka.
Length
– 716.36 m
|
Total
Bridge Length – 716.36m
Carriage
width 7.5m Approach road 500m in each side Total
Length – 1000 m
|
29.222
lacs
|
10,000.00
|
Eighteen
Months
|
|
|
|
|
|
|
|
|
|
2.
Office Inviting Tender/Bid |
:
Executive Engineer,
Rural Development Special Division, Dumka |
|
3.
Period of sale of Tender/ Bid Document |
:
From :22.04.2008
To :29.04.2008
(During Office Hours in working days) |
|
4.
Last date and time for Receipt of Bids |
:
Date :
30.04.08
Time :
15.00 Hours (3.00 P.M.)
|
|
5.
Time and date of opening of technical Bid |
:
Date :
30.04.08
Time : 16.00 Hours (4.00 P.M.)
at the Office of Chief Engineer, R.D. Special |
|
6.
Place for Sale of Tender/BID |
:
1) Chief
Engineer's Office, Rural Development Special Zone
F.F.P.
Bhawan Dhurwa, Ranchi (Jharkhand)
2)
Superintending
Engineer’s Office,
Rural Development Special Circle, Dumka (Jharkhand)
3) Executive
Engineer’s Office, Rural
Development Special,
Division
Dumka (Jharkhand) |
|
7.
Place for Receipt and Opening of Tender/BID. |
:
District Control Room,
Ranchi. |
|
|
8.
Earnest money (as mentioned in the table above)
be attached in from of 8/6 yr. N.S.C. (8th Issue)
or 3/5 yr. Post Office time deposit issued from the Post
Office of Jharkhand State or Bank Guarantee of Jharkhand State
duly pledged in favour of Executive Engineer, Rural
Development Special Division, Dumka.
9. Tenderer or his authorised representative may choose to be
present at the time of opening of Technical Bid.
10. Contractor who is registered in PWD (Road) R.D.D./
R.E.O., Jharkhand may only participate in the tender. At the
time of buying the tender documents the photocopy of
registration, Income tax clearance certificate, Sales tax
clearance certificate, Labour licence and character
certificate must be attached with the application.
11. The price of each Bid/ Tender document (S.B.D.) is Rs.
10,000.00 (Ten Thousand) only, which is non-refundable in the
form of Bank draft in favour of Executive Engineer, Rural
Development Special Division, Dumka, payable at Dumka.
12. The work is to be done on “Tum Key Basis”. The DPR,
drawing etc. are available in the office of Executive
Engineer, Rural Development Special Division, Dumka and Chief
Engineer, R.D. Special Zone, F.F.P. Bhawan, Dhurwa, Ranchi on
any working day for reference only. The contractor, however is
required to make his own design and drawing based on his own
survey, investigations, etc. of site, which will have to be
approved by the Chief Engineer, Rural Development Special
Zone, F.F.P. Bhawan, Dhurwa, Ranchi.
13. Tenderers must have experience of bridge work of length at
least 716 m and single bridge length of 430m having Raft/
Well/ Pile/ Open type of foundation etc.
14.Tenderers are advised to visit the bridge site (on
their own cost) to study the details and conditions of work
site.
15. Tender is on the basis of “Two Envelope System” of
“Technical” and “Financial” bids. Financial bid of
only technically qualified contractors shall be opened.
16. Financial bid will be opened on the date communicated by
the Chief Engineer, Rural Development Special Zone, F.F.P.
Bhawan, Dhurwa, Ranchi in which tenderers may take part.
17. One percent of D.P.R. value shall be deducted from 1st
on A/c Bill of contractor as a consultant’s fee. Contractor
will not be paid separately for the same.
18. Contractor is not allowed to sublet the work. Subletting
shall be treated as the violation of agreement and if it is
found the agreement will be rescinded and the contractor shall
be blacklisted.
19. The department reserves the right to accept or reject any
tender without assigning any reason.
20. The details if Terms and Conditions of the tender may be
seen in Tender/Bid Document.
21.The department will not
supply/provide any construction equipment and material such as
roller, cement, steel etc.
22. Work has to be executed on
the basis of guidelines and provision of MOST & H
Specification and IRC guidelines.
23. The contractor is required to
establish his own fully equipped and functional quality
control Laboratory at site of work before execution of the
work for Quality control Tests.
24. Normally, no time extension
shall be granted, except extra ordinary conditions arises.
After Scheduled time of completion the payment will be made
after deduction of 10% (Ten percent) of the agreement value.
|