1.
Name of Work (ON TURN – KEY BASIS)
|
: Package – 1
Construction of 4 (Four) Nos. of Bridges including
approach road in Seraikella – Kharsawan District in One
Package consisting of :
(i)
Construction of high level bridge over River Sona
connecting Bijar with Jojohatu in Kuchai Block Apprx. Length
of Bridge 76.09 M
(ii) Construction of high level bridge over River Ashua
connecting Sini Sidma with Bankati in Serailella Block, Apprx.
Length of Bridge 76.09 M.
(iii) Construction of High level bridge over River Bijar
connecting Bijar with Dango in Kuchai Block. Apprx. Length of
Bridge – 126.79M.
(iv) Construction of High level bridge over River Sanjay
Connecting Digarsai with Kendua Hathiya in Seraikella Block.
Approx. Length of Bridge – 152.14 M.
PACKAGE-2
Construction of 2 (two) Nos. of Bridges including
approach road in Seraikella – Kharsawan District in One
Package consisting of
:
(i) Construction of high level bridge over River Sona
connecting Ramgarh with Rampur road in Kharasawan Block.
Approx. Length of Bridge 134.14 M.
(ii) Construction of high level bridge over River Sona
connecting Baragaon with Saharbera Sinimain road in Kharsawan
Block Approx. Length of Bridge 152.20 M.
|
|
2.
Officer inviting Tender / Bid
|
: Executive Engineer Rural Development Special Division,
Seraikela.
|
|
3.
Period of sale of Tender/Bid Document
|
: FROM :
10.03.2008
TO
:
17.03.2008
(During office hours)
|
|
4.
Last date and Time for Receipt of Tender
|
: DATE :
18.03.2008
TIME :
15.00 HOURS (3.00 P.M.)
|
|
5.
Time, Date and Place of Opening of Technical Bid
|
: DATE :
18.03.2008
TIME :
16.00 HOURS (4.00 P.M.)
|
|
6.
Place for Sale of Tender/Bid
|
: 1.
Chief
Engineer’s Office, Rural
Development Special Zone
F.F.P
Bhawan, Dhurwa, Ranchi
2. Office of the Superintending Engineer
Rural Development Special Circle
Abhiyantran Bhawan, Ranchi
3. Office of the Executive Engineer
Rural Development Special Division, Seraikella.
|
|
7.
If for any reason the above mentioned dates are
changed, a separate notification will be issued for it.
|
|
8.
If the date of opening of the tender is declared as
holiday the tender will be accepted on the next working day at
the same time and venue.
|
|
9.
PLACE FOR RECEIPT & OPENING OF TENDER / BID :
District Control Room, Ranchi
|
|
10. Earnest money of Rs. 10.45 Lac and 6.87 Lac for
Package 1 and Package 2 respectively are to be attached in
form of 8/6 year N.S.C. (8th Issue) from the post
office of Jharkhand or 3/5 years post office time deposit duly
pledged to the Executive Engineer, Rural Development Special
Division, Seraikella or bank guarantee of any nationalized
schedule bank situated in Jharkhand valid up to 120 days from
the date of opening of tender, in favour of the Executive
Engineer, Rural development Special Division, Seraikella.
|
|
11.Tenderer of his/her authorized representative may
choose to be present at the time of opening of technical Bid.
|
|
12.Contractors who are registered in requiste category in
PWD/R.D.D./R.E.O. Govt. of Jharkhand, Ranchi are invited for
buying the tender documents. The Attested photocopies of
registration, Sale Tax Clearance Certificate, PAN Card, Labour
License and Character Certificate must be attached with the
application.
|
|
13. The price of the tender documents is Rs. 10,000.00 (Ten
thousand) only to each package which is non-refundable in the
form of Bank draft in favour of Executive Engineer, Rural
Development Special Division, Seraikella payable at Seraikella.
|
|
14.The work is to be done on Turn-key basis. The D.P.R.
drawing etc. available with the department may be seen in the
office of the under-signed on any working day for reference
only. The contractor, however is required to make his/her own
design and drawings based on his own survey, investigation
etc. which will have to be approved by the competent
authority. For which no extra payment will be made.
|
|
15.The Payment to the consultant who has prepared the
D.P.R. will be made on deduction of consultancy fee i.e. 1% of
total cost of the bridge from the 1st on account
bill of the contractor. The contractor will not be paid
separately for that item.
|
|
16.The Technical qualification of only those tendrers will
be considered who full fill the criteria of tools and plants
and bid capacity.
|
|
17.The contractors whose work is either not completed or
not found satisfactory in the department will not be
considered for allotment of work.
|
|
18.
Subletting of work is not permitted in any case. If
found violating this condition the agreement will be
terminated and the contractor will be black listed.
|
|
19.
The allotment of work will be done on evaluating the
avaibility of tools and plants and financial capacity of the
contractor and work load in Rural Development Department (R.E.O.
+ C.M.G.S.Y.)
|
|
20.
Work detail is as follow :
PACKAGE – 1
a)
Construction of four (4) Nos. of bridges.
b)
Approximate total length of bridges – 431.11 meters.
c)
Carriage width of deck slab – 7.5 meters.
d) Length
of approach road 200m in each bridge i.e. Total Length 800
meters.
PACKAGE – 2
a)
Construction of two (2) Nos. of bridges.
b)
Approximate total length of bridges – 286.34 meters.
c)
Carriage width of deck slab – 7.5 meters.
d)
Length of approach road 200m in each bridge i.e. Total Length
400 meters.
|
|
21.Time of Completion 12 (Twelve) Months.
|
|
22.Tenderers must have experience of bridge work out of
which length of one bridge must be of 200 meters and 150 M for
package 1 & 2 respectively having Raft / Well / Pile /
Open (type of foundation etc.)
|
|
23.Tenderers are advised to visit the bridge sites (on
their own cost) to study the details and conditions of work
site.
|
|
24.
Tender is based on “Two Envelope System” of
“Technical” and “Financial” bids, financial bids of
only technically qualified contractors shall be opened.
|
|
25.
The undersigned reserves the right to accept to reject
any tender without assigning any reason.
|
|
26.
The details of the Terms and Conditions of the tender
may be seen in Tender / Bid Document.
|
|
27.
The department will not supply / provide any
construction equipment and material such as rollers, cement,
steel etc.
|
|
28.
Work has to be exectuted on the basis of guidelines and
provision of MOST & H specifications and IRC guidelines.
|
|
29.
The contractor requires to establish his/her own fully
equipped and functional Quality Control Laboratory at the site
of work before execution of the work for Quality Control Test.
|
|
30.
Payment will be made as per availability of the fund.
|
|
Executive
Engineer
Rural
Development Special Division
Seriakella
|