| Company |
Particulars
|
Last
date of sale
|
Last
date of submission |
|
Rural
Engineering Organisation
|
Construction
of RCC Bridge
|
16.03.2010 to
20.03.2010
|
05.04.2010 at
3.00 pm.
|
|
Civil Aviation Department
|
Aircraft
for Financial Year 2010-11
|
21.03.2010
upto 5.30 pm.
|
22.03.2010 at
3.00 pm.
|
|
Water Resource Department
|
Corrigendum
|
-------------
|
------------
|
|
Water Resource Department
|
Corrigendum
|
-------------
|
------------
|
|
Water Resource Department
|
Corrigendum
|
-------------
|
------------
|
|
Road Construction Department
|
Construction
of High level RCC Bridge
|
07.04.2010 at
3.00 pm.
|
08.04.2010
at 3.00 pm.
|
|
Water Resource Department
|
Irrigation
Works
|
25.03.2010 to
29.03.2010
|
30.03.2010
at 3.00 pm.
|
|
Rural
Engineering Organisation
|
Construction
of Road
|
22.03.2010
|
23.03.2010 at
3.00 pm.
|
|
Water Resource Department
|
Construction
of Series of Check Dam
|
22.03.2010 to 26.03.2010
|
27.03.2010 at
3.30 pm.
|
|
Urban Development Department
|
Invitation
of applications for providing services on contractual basis
|
--------
|
25.03.2010 at
5.00 pm.
|
|
Urban Development Department
|
Invitation
of applications for providing services as City Managers
|
--------
|
25.03.2010
|
|
Urban Development Department
|
Invitation
of applications for procuring the services on contractual basis
|
--------
|
29.03.2010
upto 2.00 pm.
|
|
Drinking Water and Sanitation
Department
|
Construction
of Drinking Water
|
26.03.2010
|
27.03.2010
upto 3.00 pm.
|
|
Water Resource Department
|
Construction
of SLR Bridge
|
18.03.2010
|
19.03.2010 at
3.00 pm.
|
|
Water Resource Department
|
Construction
of Series of Check Dam
|
20.03.2010 to 25.03.2010
|
26.03.2010 at
3.00 pm.
|
|
Water Resource Department
|
Construction
of Series of Check Dam
|
16.03.2010 to 22.03.2010
|
23.03.2010 at
3.00 pm.
|
|
Water Resource Department
|
Construction
of Series of Check Dam
|
19.03.2010 to 25.03.2010
|
26.03.2010 at
3.00 pm.
|
|
Water Resource Department
|
Construction
of Series of Check Dam
|
19.03.2010 to 25.03.2010
|
26.03.2010 at
3.00 pm.
|
|
Water Resource Department
|
Construction
of Series of Check Dam
|
19.03.2010 to 25.03.2010
|
26.03.2010 at
3.00 pm.
|
|
Welfare
Department
|
Supply
of cycles
|
17.03.2010
|
19.03.2010 at
1.00 pm.
|
|
Water Resource Department
|
Construction
of Series of Check Dam
|
15.03.2010 to 19.03.2010
|
20.03.2010 at
3.00 pm.
|
|
Water Resource Department
|
Construction
of Series of Check Dam
|
13.03.2010 to 19.03.2010
|
20.03.2010 at
3.00 pm.
|
|
Water Resource Department
|
Construction
of Series of Check Dam under Minor irrigation Sub Division Simaria
under Tandwa Block on Bukroo Nala
|
13.03.2010 to 19.03.2010
|
20.03.2010 at
3.00 pm.
|
|
Building Division
|
Construction
of Silli football stadium, Jharkhand
|
15.03.2010 at 10 am to 5
pm.
|
16.03.2010 at
3.00 pm.
|
|
Road Construction Department
|
Construction
of Road
|
09.03.2010 at 3.00 pm.
|
10.03.2010 at
3.00 pm.
|
|
Road Construction Department
|
Construction
of Road
|
19.03.2010 to 20.03.2010
|
23.03.2010 at
3.00 pm.
|
|
Water Resource Department
|
Construction
of Series of Check Dam on Kunderhiya Nala in Medininagar
|
12.03.2010 to 16.03.2010
|
17.03.2010 at
3.00 pm.
|
|
Water Resource Department
|
Construction
of Series of Check Dam on Pinjra Nala in Gumla
|
09.03.2010 to 15.03.2010
|
16.03.2010 at
3.00 pm.
|
|
Water Resource Department
|
Construction
of Check Dam
|
10.03.2010 to 16.03.2010
|
17.03.2010 at
3.00 pm.
|
|
Water Resource Department
|
Construction
of Dam on Gagar Sotiya
|
12.03.2010 to 19.03.2010
|
20.03.2010 at
3.00 pm.
|
|
Water Resource Department
|
Construction
of Submersible bridge over river Jamunia near Tamba Gudio
|
15.03.2010 to 20.03.2010
|
23.03.2010 at
3.00 pm.
|
|
Water Resource Department
|
Construction
of Series of Check Dam on Bardewa Nala near village Bano
|
09.03.2010 to 16.03.2010
|
17.03.2010 at
3.00 pm.
|
|
Water Resource Department
|
Construction
of Series of Check Dam
|
11.03.2010 to 16.03.2010
|
17.03.2010 at
3.30 pm.
|
|
Water Resource Department
|
Construction
of Series of Check Dam
|
10.03.2010 to 16.03.2010
|
17.03.2010 at 3.00 pm.
|
|
Water Resource Department
|
Construction
of Series of Check Dam
|
10.03.2010 to 16.03.2010
|
17.03.2010 at 3.00 pm.
|
|
Road Construction Department
|
Construction
of balance work of approaches and viaducts of R.O.B.
|
09.03.2010 to 12.03.2010
|
25.03.2010 at 3.00 pm.
|
|
Finance Department
|
Work
of Computer maintenance
|
15.03.2010 at 3.00 pm.
|
16.03.2010 at 3.00 pm.
|
|
Finance Department
|
Work
of Computer maintenance
|
25.02.2010 to 09.04.2010
|
10.04.2010 at 3.00 pm.
|
|
Water Resource Department
|
Contraction
of Check Dam
|
05.02.2010
to 11.03.2010
|
12.03.2010 at 3.00 pm.
|
|
Education Department
|
Purchasing
of Ladies Cycle for Distributing School Girls
|
03.03.2010
|
03.03.2010 at 3.00 pm.
|
|
Water Resource Department
|
Contraction
of Check Dam
|
05.02.2010
to 11.03.2010
|
12.03.2010 at 3.00 pm.
|
|
Department of Science and Technology
|
Establishment
IT Knowledge Centre
|
------------
|
15.03.2010 at 3.00 pm.
|
|
Road Construction Department
|
Construction
of Road
|
------------
|
16.03.2010 at 3.00 pm.
|
|
Department
of Urban Development
|
Urban
Development Work
|
25.02.2010
at 3.00 pm.
|
10.03.2010 at 3.00 pm.
|
|
Education Department
|
Construction
of Government Teachers Training College and Hostel Building
|
13.02.2010
to 04.03.2010
|
05.03.2010 at 3.00 pm.
|
|
Rural
Engineering Organisation
|
Construction of
R.C.C. Bridge
|
19.02.2010
to 22.02.2010
|
25.02.2010 at 3.00 pm.
|
|
Department
of Urban Development
|
Construction
of dwelling units and Development of infrastructure
|
08.02.2010 to 03.03.2010
|
04.03.2010 at
3.00 pm.
|
|
Department of Science and Technology
|
Training
on "Computer Fundamentals & office automation tools"
|
04.02.2010 to 25.02.2010
|
26.02.2010 at
1.00 pm.
|
|
Welfare
Department
|
Construction
of Building for Community Health Center
|
Up to 22.02.2010 Office
hours.
|
24.02.2010 at
3.00 pm.
|
|
Welfare
Department
|
Construction
of Community Health Center
|
17.02.2010 to 24.02.2010
|
25.02.2010 at
3.00 pm.
|
|
Department
of Urban Development
|
Urban
Development Work
|
22.02.2010 upto 2.00 pm.
|
22.02.2010 at
4.00 pm.
|
|
Road Construction Department
|
Construction
of Road
|
03.03.2010 to 05.03.10
|
08.03.2010 at
3.00 pm.
|
|
Road Construction Department
|
Construction
of Road
|
13.02.2010 to 16.02.10
|
25.02.2010 at
3.00 pm.
|
|
Building Division
|
Construction
of Building
|
09.02.2010 at 1.00 pm
|
10.02.2010 at
3.00 pm.
|
|
Building Division
|
Construction
of I.T.I. Building
|
------------
|
17.02.2010 at
3.00 pm.
|
|
Forest and Environment Department
|
Current
assessment of Afforestation Programme
|
------------
|
27.01.2010 at
1.00 pm.
|
|
Building Division
|
Construction
of Industrial Institute
|
28.01.10 upto 03.02.10
|
04.02.2010 at
3.00 pm.
|
|
Animal Husbandry and Fisher Department
|
insuring
of 7000 (Seven Thousand Only) indigenous/Crossbred milch cattle and
buffaloes
|
-----------
|
28.01.2010 at
11.00 pm.
|
|
Road Construction Department
|
Construction
of Road
|
28.01.2010 at 1.00 pm.
|
29.01.2010 at
3.00 pm.
|
|
Rural
Engineering Organisation
|
Construction
of Road
|
27.01.2010 at 3.00 pm.
|
28.01.2010 at
3.00 pm.
|
|
Road Construction Department
|
Construction
of Road
|
20.01.2010 at 3.00 pm.
|
21.01.2010 at
3.00 pm.
|
|
Rural
Engineering Organisation
|
Technical
Support
|
--------------
|
--------------
|
|
Road Construction Department
|
Maintenance
& Updation of e-Nibandhan application a
|
22.01.10
|
22.01.10 up to
2.30 pm.
|
|
Road Construction Department
|
Widening
and Strengthening Work
|
09.01.10 to 15.01.10
|
22.01.10 up to
3.30 pm.
|
|
Water
Resources Division
|
Irrigation
Works
|
12.11.09 to 18.11.09
|
19.11.09 up to
3.00 pm.
|
|
Water
Resources Division
|
Residual
concrete lining work
|
12.11.09 to 18.11.09
|
19.11.09 up to
3.00 pm.
|
|
Drinking Water and Sanitation
Department
|
Construction
of Intake well cum Raw water Pump House
|
------------
|
-------------
|
|
Road Construction Department
|
Construction
of Road
|
------------
|
-------------
|
|
Water
Resources Division
|
Construction
of residual Lining work
|
11.11.09 to
17.11.09
|
18.11.09 up to
3.00 pm.
|
|
Rural
Engineering Organisation
|
Construction
of Road
|
-------------
|
06.11.09 up to
5.00 pm.
|
|
Road Construction Department
|
Construction
of Road
|
22.10.09 to
23.10.09
|
03.11.09 up to
3.00 pm.
|
|
Rural
Engineering Organisation
|
Construction
of Road
|
28.10.09 to
29.10.09
|
30.11.09 up to
3.00 pm.
|
|
Road Construction Department
|
Repairment
of Road
|
13.10.09 to
14.10.09
|
15.11.09 up to
3.00 pm.
|
|
Road Construction Department
|
Widening
and Strengthening Work
|
21.10.09 to
29.10.09
|
07.11.09 up to
3.30 pm.
|
|
Health Department
|
Construction
of Hospital Building
|
29.10.09
|
30.10.09 up to
3.00 pm.
|
|
Road Construction Department
|
Construction
of Road
|
13.10.09
|
21.10.09 up to
3.00 pm.
|
|
Drinking Water and Sanitation
Department
|
Surveying,
Engineering Studies, Designing
|
19.10.09 to
5.00 pm
|
27.10.09 up to
3.30 pm.
|
|
Road Construction Department
|
Construction
of Road
|
05.10.09 to
07.10.09
|
10.10.09 up to
3.00 pm.
|
|
Drinking Water and Sanitation
Department
|
Construction
of Drinking Water
|
13.10.09 up to
5.00 pm.
|
16.10.09 up to
3.30 pm.
|
|
Road Construction Department
|
Integrated
ROB cum Flyover, approach road & high level RCC Bridge
|
-------------
|
07.10.09 at
3.00 pm.
|
|
Jharkhand State Electricity Board
|
Cancellation
of Tenders
|
-------------
|
--------------
|
|
Road Construction Department
|
Construction
of Road
|
05.10.09
|
06.10.09 at
3.00 pm.
|
|
Road Construction Department
|
Widening
to 2 Lane & Strengthenning of the stretch
|
03.10.09 to
09.10.09
|
19.10.09 at
3.00 pm.
|
|
Department of Industries
|
Design,
Erection, Maintenance & Management of Jharkhand Pavilion in IITF
|
18.09.09
|
05.10.09 at
3.00 pm.
|
|
Road Construction Department
|
Emergent
construction of diversion road on revised alignment
|
23.09.09 at
1.00 pm.
|
24.09.09 at
3.00 pm.
|
|
Rural
Engineering Organisation
|
Construction
of Road
|
30.09.09 at
3.00 pm.
|
03.10.09 at
3.00 pm.
|
|
Rural
Engineering Organisation
|
Construction
of Road
|
24.09.09 to
01.10.09
|
03.10.09 at
3.00 pm.
|
|
Road Construction Department
|
Construction
of Road
|
23.09.09 to
29.09.09
|
30.09.09 at
3.00 pm.
|
|
Health
Division
|
Construction
of Community Health Center
|
29.09.09 to
06.10.09
|
07.10.09 at
3.00 pm.
|
|
Rural
Engineering Organisation
|
Construction
of Road
|
30.09.09 at
17.00 hours
|
03.10.09 at
13.30 hours
|
|
Building Construction Division
|
Construction
of collectoriate building
|
01.10.09 to
05.10.09
|
09.10.09 upto
3.00 pm.
|
|
Road Construction Department
|
Construction
of Road
|
07.09.09 to
12.09.09
|
18.09.09 upto
3.00 pm.
|
|
Road Construction Department
|
Construction
of Road
|
14.09.09 to
16.09.09
|
22.09.09 upto
3.00 pm.
|
|
Drinking Water and Sanitation
Department
|
Construction
of Drinking Water
|
17.09.09 at
5.00 pm.
|
18.09.09 at
3.30 pm.
|
|
Road Construction Department
|
Construction
of Road
|
01.09.09 to
03.09.09
|
07.09.09 at
3.00 pm.
|
|
Rural
Engineering Organisation
|
Construction
of Bridge
|
29.08.09 to
03.09.09
|
04.09.09 at
3.00 pm.
|
|
Water Resource Department
|
Irrigation
Works
|
01.09.09 to
07.09.09
|
08.09.09 at
3.00 pm.
|
|
Building Construction Division
|
Construction
of building
|
31.08.09 at
3.00 pm.
|
01.09.09 at
3.00 pm.
|
|
Road Construction Department
|
Construction
of Road
|
01.09.09 to
03.09.09
|
08.09.09 at
3.00 pm.
|
|
Jharkhand State Electricity Board
|
Extension
of Due Date
|
---------------
|
17.08.09 at
1.00 pm.
|
|
Jharkhand State Electricity Board
|
Tender
Extension Notice
|
27.08.09 to
26.08.09
|
27.08.09 at
2.00 pm.
|
|
Rural
Engineering Organisation
|
Construction
of Road
|
24.08.09 to
25.08.09
|
26.08.09 at
3.00 pm.
|
|
Rural
Engineering Organisation
|
Construction
of H. L. Bridge
|
17.08.09 to
24.08.09
|
25.08.09 at
3.30 pm.
|
|
Rural
Engineering Organisation
|
Construction
of Road
|
18.08.09
at 5.00pm.
|
21.08.09 at
1.30 pm.
|
|
Tourism
Department
|
Development
of Masanjore
Tourist
|
11.08.09 to
18.08.09
|
20.08.09 at
3.00 pm.
|
|
Road Construction Department
|
Construction
of Road
|
11.08.09 at
1.00 pm.
|
12.08.09 at
3.00 pm.
|
|
Jharkhand State Electricity Board
|
Tender
Extension Notice with date and revised estimate cost
|
10.08.09 at 5.00 pm.
|
11.08.09 at 5.00 pm.
|
|
Jharkhand State Electricity Board
|
Supply
of materials
|
----
|
20.08.09
at 1.00 pm.
|
|
Drinking Water and Sanitation
Department
|
Details
Surveying Engineering Studies Designing of RCC Intake well with Pump
House
|
07.08.09 at 5.00 pm.
|
13.08.09
at 3.30 pm.
|
|
Water Resource Department
|
Irrigation
Works
|
03.08.09 to
11.08.09
|
12.08.09
at 3.00 pm.
|
|
Road Construction Department
|
Strengthening
for signal lane
|
17.08.09 to
21.08.09
|
24.08.09
at 3.30 pm.
|
|
Jharkhand Jail Department
|
Setting
up Reserves Osmoiz system in Jail
|
18.07.09
|
10.08.09 upto
3.00 pm.
|
|
Building Construction Division
|
Construction
of school building
|
07.08.09 upto
1 pm.
|
08.08.09 upto
3.00 pm.
|
|
Road Construction Department
|
Widening
& Strengthening of Ranchi-Chaibasa Road
|
28.07.09 to
04.08.09
|
20.08.09 upto
3.30 pm.
|
|
Jharkhand State Electricity Board
|
Supply
of materials
|
-------------
|
30.07.09 upto
1.00 pm.
|
|
Tourism
Department
|
Construction
of Tourist Information Center
|
11.07.09 to
25.07.09
|
27.07.09 at
2.00 pm.
|
|
Jharkhand State Electricity Board
|
Procurement
of Belt Vulunizer, Spares, Mechanical Seal, Tube Nest and Air Circle
|
05.08.09 upto
5.00 pm.
|
06.08.09 upto
5.00 pm.
|
|
Jharkhand State Electricity Board
|
Supply
of the materials/ spares
|
05.08.09 upto
5.00 pm.
|
06.08.09 upto
5.00 pm.
|
|
Jharkhand State Electricity Board
|
Supply
of the materials
|
19.07.09
|
20.07.09 upto
1.00 pm.
|
|
Jharkhand State Electricity Board
|
Tender
Extension Notice
|
15.07.09 upto
4.00 pm.
|
16.07.09 upto
4.00 pm.
|
|
Jharkhand State Electricity Board
|
Tender
Extension Notice
|
16.07.09 upto
5.00 pm.
|
17.07.09 upto
5.00 pm.
|
|
Drinking Water and Sanitation Department
|
Details
survey, design, construction of Water Treatment Plant
|
18.07.09 upto
5.00 pm.
|
22.07.09 upto
3.00 pm.
|
|
Road Construction Department
|
Detailed
Project Report for a Railway Over Bridge
|
--------------
|
10.07.09 upto
3.00 pm.
|
|
Drinking Water and Sanitation Department
|
Details
survey, design, construction commissioning on turn-key basis
|
18.07.09 upto
5.00 pm.
|
22.07.09 upto
3.00 pm.
|
|
Jharkhand State Electricity Board
|
Provision
of retaining wall along with Earth filling of 33/11K.V P/S/S
|
--------------
|
20.07.09 upto
3.00 pm.
|
|
Jharkhand State Electricity Board
|
Job
contract for overhauling and replacement of H.P. valves of Boiler
|
07.08.09 upto
5.00 pm.
|
08.08.09 upto
5.00 pm.
|
|
Jharkhand State Electricity Board
|
Appointment
of Input based Franchisee for Supply of Electricity
|
03.07.09 upto
3.00 pm.
|
15.07.09 upto
3.00 pm.
|
|
Jharkhand State Electricity Board
|
Balance
civil of work on control room 33/KVA
|
16.07.09 upto
5.00 pm.
|
17.07.09 upto
3.00 pm.
|
|
Road Construction Department
|
Construction
of Road
|
13.07.09 to
15.07.09
|
23.07.09 upto
3.00 pm.
|
|
Road Construction Department
|
Repair
of Road
|
04.07.09-.
|
07.07.09 upto
3.00 pm.
|
|
Jharkhand State Electricity Board
|
Supply
of static energy meters
|
29.06.09-at 10.00am.
|
15.07.09 upto
1.00 pm.
|
|
Jharkhand State Electricity Board
|
Tender Notice
|
--------------------
|
---------------------
|
|
Road Construction Department
|
Construction
of Road
|
08.07.09 at
1.00 pm.
|
09.07.09 at 3.00 pm.
|
|
Jharkhand State Electricity Board
|
Tender
Extension Notice
|
04.07.09 to
09.07.09
|
10.07.09 upto
3.00 pm.
|
|
Jharkhand State Electricity Board
|
Cancellation
of Tender
|
--------------
|
------------
|
|
Jharkhand State Electricity Board
|
Day-to-day
maintenance of water supply and sanitary Installation of JSEB
|
--------------
|
04.07.09 upto 3.00 pm.
|
|
Road Construction Department
|
Construction
of Road
|
25.06.09 to
29.06.09
|
03.07.09 at
3.00 pm.
|
|
Department
of Rural Development
|
Accrual
Based Double Entry System
|
---------------------
|
07.07.09 till
4.00 pm.
|
|
Department
of Rural Development
|
National
Urban Transport Policy 2006
|
---------------------
|
06.07.09 till
4.00 pm.
|
|
Jharkhand State Electricity Board
|
Notice
of NIT no. 661/PR/JSEB/08-09
|
---------------------
|
--------------
|
|
Jharkhand State Electricity Board
|
Supply
of Materials
|
---------------------
|
27.06.09 upto
3.00 pm.
|
|
Health
Division
|
Health
Medical Education & Family Welfare
|
---------------------
|
15.07.09
|
|
Jharkhand State Electricity Board
|
Construction
of maintenance office cum store along with open parking
|
---------------------
|
29.06.09 at
3.00 pm.
|
|
Road Construction Department
|
Widening
and Strengthening Work for double lane
|
27.06.09 to
06.07.09
|
13.07.09 at
3.00 pm.
|
|
Jharkhand State Electricity Board
|
Tenders
Notice
|
-----------
|
-----------
|
|
Tourism
Department
|
Construction
of Tourist Information Center
|
08.06.09 to
29.06.09
|
30.06.09 at
2.00 pm.
|
|
Road Construction Department
|
Construction
of Road
|
22.06.09 to
27.06.09
|
01.07.09 at 3.00 pm.
|
|
Road Construction Department
|
Construction
of Road
|
27.06.09 to
01.07.09
|
03.07.09 at 3.00 pm.
|
|
Jharkhand State Electricity Board
|
Supply
of Materials
|
---------
|
08.07.09 upto
5.00 pm.
|
|
Jharkhand State Electricity Board
|
Renovation
and upgradation of 'A' type colony drains at Board's KUSAI colony
|
---------
|
26.06.09 upto
3.00 pm.
|
|
Jharkhand State Electricity Board
|
Extension
of sale of BOQ of NIT 39/PR/JSEB/09-10
|
09.06.09 till
5.00 pm.
|
11.06.09 upto
3.00 pm.
|
|
Jharkhand State Electricity Board
|
Supply
of Materials
|
------------
|
15.06.09 upto
2.00 pm.
|
|
Jharkhand State Electricity Board
|
Notice
Invited for Providing Commercial Vehicle on Hired Basis
|
------------
|
26.06.09 at 3.00 pm.
|
|
Jharkhand State Electricity Board
|
Renovation
and upgradation of 'B' type colony drains at Board's colony
|
------------
|
24.06.09 upto
3.00 pm.
|
|
Tenughat
Vidyut Nigam Limited
|
ID
Fan Motor 6.6kv, 1500 KW (Make-BHEL or Any reputed make)
|
29.06.09 upto
5.00 pm.
|
30.06.09 upto
3.30 pm.
|
|
Jharkhand State Electricity Board
|
Provision
for internal water supply
|
-------------
|
20.06.09 at
3.00 pm.
|
|
Jharkhand State Electricity Board
|
Construction
of shed for kitchen & hall for meeting cum dining purpose
|
18.06.09
|
19.06.09 at
3.30 pm.
|
|
Tourism
Department
|
Construction
of Wayside Amenity, "Highway Palash"
|
-------------
|
29.06.09 at
3.00 pm.
|
|
Jharkhand State Electricity Board
|
Continuous
electric welding of bracing members of tower in 220KV
|
01.06.09 to
11.06.09
|
12.06.09 upto
12.30 pm.
|
|
Jharkhand State Electricity Board
|
NIT
NO.77/ PR /PR/ JSEB/ 09-10
|
-------------
|
18.06.09 upto 3.00 pm.
|
|
Road Construction Department
|
Construction
of New High Level RCC Bridge
|
10.06.09 to
3.00 pm.
|
11.06.09 at
3.00 pm.
|
|
Drinking Water and
Sanitation Department
|
Construction
of Drinking Water
|
16.06.09
|
17.06.09 at
4.30 pm.
|
|
Drinking Water and
Sanitation Department
|
Construction
of Drinking Water
|
16.06.09 at
5.00 pm.
|
17.06.09 at
3.30 pm.
|
|
Road Construction Department
|
Construction
of Road
|
12.06.09 at
3.00 pm.
|
13.06.09 at
3.00 pm.
|
|
Rural Engineering
Organisation
|
Construction
of Road
|
15.06.09 at 10
to 5.00 pm.
|
17.06.09 at
3.00 pm.
|
|
Tourism
Department
|
Construction
of Wayside Amenity "Highway Palash"
|
-------------
|
20.06.09 at
3.00 pm.
|
|
Tourism
Department
|
Construction
of Tourist Information Center
|
-------------
|
15.06.09 at
3.00 pm.
|
|
Jharkhand State Electricity Board
|
To
provide support services to JSEB in trading of Energy through Energy
Exchange platform under Member-client mode.
|
08.06.09 to
17.06.09
|
18.06.09 upto
2.00 pm.
|
|
Jharkhand State Electricity Board
|
Construction
of 'D' type double storied (4 unit) Qtr at G/S/S Latehar including W/S,
S/I & internal Electrification works
|
-------------
|
12.06.09 upto
3.00 pm.
|
|
Jharkhand State Electricity Board
|
Procurement
of Spares of Ball Mills of Unit No 7 at PTPS
|
17.06.09 upto 5.00 pm.
|
18.06.09 upto
5.00 pm.
|
|
Jharkhand State Electricity Board
|
Procurement
of Belt Vulcunizer and its Control Box for conveyor Belt of 400 MW CHP
at PTPS
|
17.06.09 upto 5.00 pm.
|
18.06.09 upto
5.00 pm.
|
|
Drinking Water and
Sanitation Department
|
Construction
of Drinking Water
|
16.06.09 at
5.00 pm.
|
17.06.09 at
3.30 pm.
|
|
Road Construction Department
|
Construction
of Road
|
09.06.09 at
1.00 pm.
|
10.06.09 at
3.00 pm.
|
|
Rural Engineering
Organisation
|
Construction
of Bridge
|
10.06.09 to
15.06.09
|
16.06.09 at
3.00 pm.
|
|
Jharkhand State Electricity Board
|
Procurement
of Activated Carbon for Filter Media (CWTP PTPS)
|
17.06.09 upto
5.00 pm.
|
18.06.09 upto
5.00 pm.
|
|
Jharkhand State Electricity Board
|
Angle
with stub welding in legs of towers in rusted portion of legs
|
25.05.09 to
04.06.09
|
05.06.09 upto
12.30 pm.
|
|
Jharkhand State Electricity Board
|
Construction
of AEE Qtr C- type (1 unit) Qtr at G/S/S Japla including W/S
|
-----------
|
10.06.09 upto
3.00 pm.
|
|
Jharkhand State Electricity Board
|
Corrigendum
|
-----------
|
-------------
|
|
Jharkhand State Electricity Board
|
Extension
of due date
|
28.05.09
|
03.06.09 at
2.00 pm.
|
|
Jharkhand State Electricity Board
|
Installation
and commissioning of new Air Conditioner System
|
25.05.09
|
27.06.09 at
3.00 pm.
|
|
Jharkhand State Electricity Board
|
Supply
of Xerox photo copier and Fax machine
|
--------------------
|
10.06.09 at
3.30 pm.
|
|
Drinking Water and
Sanitation Department
|
Details
survey, design, construction commissioning on turn-key basis under
Bishrampur Rural Pipe Water Supply Scheme
|
03.06.09
upto 05.00pm
|
08.06.09 at
3.30 pm.
|
|
Drinking Water and
Sanitation Department
|
Improved
quality of drinking water to school children
|
--------
|
11.06.09 at
3.00 pm.
|
|
Drinking Water and
Sanitation Department
|
Details
Surveying Engineering Studies Designing of RCC Intake well with high
pump
|
02.06.09
upto 05.00pm
|
05.06.09 at
11.00 pm.
|
|
Water Resource Department
|
Construction
of weir over Subernrekha river for Birsa Nagar-Bagunhatu Urban Water
supply scheme
|
27.05.09
to 04.06.09
|
05.06.09 at
3.30 pm.
|
|
Jharkhand State Electricity Board
|
Day
to day maintenance of water supply system in main colony at PTPS
|
23.05.09
at 3.30pm
|
25.05.09 at
3.30 pm.
|
|
Jharkhand State Electricity Board
|
Job
contract for for correction of fire ball by shifting water wall
tube
|
25.05.09
at 5.00pm
|
26.05.09 at
5.00 pm.
|
|
Jharkhand State Electricity Board
|
Job
contract for Major maintenance of main boiler of unit no 6
|
01.06.09
at 5.00pm
|
02.06.09 at
5.00 pm.
|
|
Drinking Water and
Sanitation Department
|
Details
Surveying Engineering Studies Designing of Water Treatment Plant
|
03.06.09
at 5.00pm
|
08.06.09 at
3.30 pm.
|
|
Building Division
|
Construction
of building
|
11.06.09
at 1.00pm
|
12.06.09 at
3.00 pm.
|
|
Rural Engineering
Organisation
|
Construction
of Road
|
29.05.09
to 02.06.09
|
03.06.09 at
3.00 pm.
|
|
Jharkhand State Electricity Board
|
Construction
of E type Qtr Nit 51-56
|
------
|
05.06.09 at
3.00 pm.
|
|
Health
Division
|
Construction
of Primary Health Centre Building at Dangapara
|
27.05.09 at
4.00 pm.
|
28.05.09 at
3.00 pm.
|
|
Road Construction Department
|
Construction
of Road
|
08.06.09 to
11.06.09
|
15.06.09 at
3.00 pm.
|
|
Jharkhand State Electricity Board
|
Construction
of inspection bunglow including W/S
|
---------
|
04.06.09 at
3.00 pm.
|
|
Road Construction Department
|
Construction
of Road
|
20.05.09
to 25.05.09
|
26.05.09 at
3.00 pm.
|
|
Rural Engineering
Organisation
|
Construction
of Road
|
---------
|
------------
|
|
Jharkhand State Electricity Board
|
Provision
of septic tanks NIT-48-49
|
---------
|
03.06.09 at
2.00 pm.
|
|
Jharkhand State Electricity Board
|
Repair
of distribution transformers
|
---------
|
05.06.09 at
1.00 pm.
|
|
Jharkhand State Electricity Board
|
Renovation
of boundary wall NIT- 44-46
|
---------
|
03.06.09 at
3.00 pm.
|
|
Jharkhand State Electricity Board
|
Procurement
of Shaft for boiler feed pumps
|
03.06.09
at 5.00 pm
|
04.06.09 at
5.00 pm.
|
|
Jharkhand State Electricity Board
|
Construction
of new cable trench
|
26.05.09
to 02.06.09
|
08.06.09 at
1.00 pm.
|
|
Road Construction Department
|
Widening
& Strengthening of Road
|
25.05.09
to 27.05.09
|
01.06.09 at
3.00 pm.
|
|
Road Construction Department
|
Widening
& Strengthening of Road
|
25.05.09
to 29.05.09
|
30.05.09 at
3.00 pm.
|